23.07.2013 Views

Trip report regarding remote sensing activities at ... - Up To - SOPAC

Trip report regarding remote sensing activities at ... - Up To - SOPAC

Trip report regarding remote sensing activities at ... - Up To - SOPAC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

METHOD<br />

1. Study of the existing documents<br />

All mapping inform<strong>at</strong>ion relevant to the BA River area<br />

was studied, especially the following :<br />

_- the topographic map, Viti Levu, sheet 1 (1961),<br />

_- the geologic map, Viti Levu, sheet 1 (1983).<br />

_- the draft of the b<strong>at</strong>hymetric map of the Sa River<br />

Delta area (Ref. 2),<br />

_ the positive film of the SPOT image<br />

(1988),<br />

-_ the paper print of the LANDSAT MSS image (1978).<br />

For geographic incomp<strong>at</strong>ibility, the existing b<strong>at</strong>hymetric<br />

chart was not taken into account.<br />

2. Processing the raw d<strong>at</strong>a (tape)<br />

The s<strong>at</strong>ellite images are recorded on a Computer<br />

Comp<strong>at</strong>ible Tape (CCT).<br />

All processes used during the survey were obtained using the<br />

SPT in-house image processing software named GRINGO.<br />

The following method description takes the example of SPOT<br />

d<strong>at</strong>a. Three channels are taken into account to load the<br />

three SPOT channels :<br />

-_ the infra-red band (XS3),<br />

- the red band (XS2),<br />

-_ the green band (XS1).<br />

3. Decoding and extraction<br />

Decoding the CCT is done in two stages, because the control monitor<br />

can only manage a certain amount of d<strong>at</strong>a <strong>at</strong> a time. Therefore, we have<br />

to select a restricted area. The control monitor used <strong>at</strong> SPT 1s a userprogrammable<br />

image and graphic display; it is designed to off-load<br />

display and interactive processing task from a central image<br />

processing system. The maximum capability of the IVAS monitor is 1024 x<br />

1024 pixels (elementary image unit). The size of the pixel is different<br />

from one s<strong>at</strong>ellite to another. SPOT XS mode (colour) pixel size is 400<br />

sq metres and LANDSAT MSS pixel size is 4800 sq metres.<br />

In a first stage, the geometric coordin<strong>at</strong>es of the selected<br />

zone are calcul<strong>at</strong>ed from the film or print of the image.<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!