CIMdata review on SAP's PLM cPDm program (PDF) - Large ...
CIMdata review on SAP's PLM cPDm program (PDF) - Large ...
CIMdata review on SAP's PLM cPDm program (PDF) - Large ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SAP has taken advantage of the integrated nature of<br />
mySAP <strong>PLM</strong> by providing the Order Change<br />
Management (OCM) module, a soluti<strong>on</strong> originally<br />
developed for the E&C and Aerospace market, which<br />
is now generally available for all engineering-to-order<br />
and made-to-order businesses.<br />
Essentially, OCM extends the existing change management<br />
capabilities of mySAP <strong>PLM</strong> to provide automated<br />
modificati<strong>on</strong>s to producti<strong>on</strong> or purchase orders and<br />
planning informati<strong>on</strong>. The process is triggered either<br />
by a change raised by a customer, which will effect the<br />
sales order, or coming from an engineer which will<br />
cause a change to master data (see Figure 9).<br />
OCM manages this situati<strong>on</strong> in the following steps<br />
(e.g., for complex change management):<br />
• An ECR is created<br />
• The ECR will be approved and c<strong>on</strong>verted to an ECO<br />
• Objects will be changed and the ECO will be released<br />
• A search is made for effected producti<strong>on</strong> orders,<br />
which generates a change request producti<strong>on</strong> order<br />
• The nature of required changes to any active<br />
producti<strong>on</strong> orders is determined, the change steps<br />
are defined, any active producti<strong>on</strong> orders that are<br />
effected are blocked<br />
• The derived changes (insert and delete) are checked<br />
for c<strong>on</strong>flicts and a report indicating warnings,<br />
errors, or no c<strong>on</strong>flict situati<strong>on</strong>s is generated<br />
• The required changes are made to blocked active<br />
producti<strong>on</strong> orders<br />
• Change requests are closed and<br />
the change process steps are<br />
deleted<br />
• A history of the changes made is<br />
maintained <strong>on</strong> the producti<strong>on</strong><br />
order<br />
• Producti<strong>on</strong> orders can be changed<br />
and processed many times over<br />
OCM is an advanced feature enabling<br />
integrated change management<br />
processes between engineering and<br />
manufacturing. This type of functi<strong>on</strong>ality<br />
is not readily found in most<br />
<strong>cPDm</strong> soluti<strong>on</strong>s. Benefits are shorter<br />
ramp-up to producti<strong>on</strong>, more costeffective<br />
changes, and the ability to<br />
react better to last-minute change<br />
requests especially in made-to-order<br />
envir<strong>on</strong>ments.<br />
Page 22<br />
SAP’s mySAP <strong>PLM</strong><br />
mySAP <strong>PLM</strong> also offers Change Notificati<strong>on</strong>s with its<br />
release 4.6C services. Notificati<strong>on</strong>s are used in many<br />
areas of the mySAP <strong>PLM</strong> soluti<strong>on</strong> (e.g., for quality<br />
notificati<strong>on</strong>s, claims, or within change requests).<br />
Via the Web interface, a company's customers can<br />
issue change notificati<strong>on</strong>s or claims (see Figure 10),<br />
which are routed directly to the corresp<strong>on</strong>ding project<br />
manager via Workflow. Project managers can perform<br />
cost impact analysis and then trigger the corresp<strong>on</strong>ding<br />
follow-up acti<strong>on</strong>s, such as the creati<strong>on</strong> of an ECR. This<br />
functi<strong>on</strong>ality can be used as a generic change request<br />
before a formal ECR is created.<br />
Product Structure Management<br />
One of the major strengths of mySAP <strong>PLM</strong> is its product<br />
structure management capabilities. These capabilities<br />
can be divided into four primary functi<strong>on</strong>al areas:<br />
• Material BOM Management<br />
• C<strong>on</strong>figurati<strong>on</strong> Management (CM)<br />
• Integrated Product and Process Engineering (iPPE)<br />
• Internet Pricing and C<strong>on</strong>figurator<br />
To describe these capabilities, this secti<strong>on</strong> is divided<br />
into four subsecti<strong>on</strong>s, each focusing <strong>on</strong> a specific level<br />
of mySAP <strong>PLM</strong> product structure management functi<strong>on</strong>ality.<br />
Figure 10-Web-Based Notificati<strong>on</strong> (Claims)<br />
<str<strong>on</strong>g>CIMdata</str<strong>on</strong>g> Program Assessment