<strong>The</strong> optimiz<strong>in</strong>g <strong>of</strong> power system operation will, <strong>in</strong> the future, also<br />
require a modification <strong>of</strong> the tariff system<br />
New tariff system<br />
• Need to modify tariff systems <strong>and</strong> im<strong>pl</strong>ement mechanisms that optimize power system operation,<br />
<strong>in</strong>clusive <strong>of</strong> the follow<strong>in</strong>g:<br />
‒ <strong>in</strong>troduction <strong>of</strong> a nodal po<strong>in</strong>t tariff (<strong>in</strong>stead <strong>of</strong> a postage stamp tariff or zone tariff)<br />
‒ s<strong>pl</strong>it <strong>of</strong> the tariff between consumers <strong>and</strong> generation<br />
‒ ap<strong>pl</strong>ication <strong>of</strong> the connection fee mechanism as a tool for optimiz<strong>in</strong>g location decision with<strong>in</strong><br />
generation<br />
• In many countries it is necessary to prepare <strong>and</strong> im<strong>pl</strong>ement reforms <strong>of</strong> the electricity market <strong>in</strong><br />
order to ensure effective, <strong>in</strong> relation to safety <strong>and</strong> cost, system operation <strong>in</strong> the short <strong>and</strong> long<br />
term perspective, with particular emphasis on the follow<strong>in</strong>g:<br />
– architecture <strong>of</strong> market segments adm<strong>in</strong>istered by TSO, there<strong>in</strong>, <strong>in</strong> particular, the real time<br />
market<br />
– conditions related to the performance <strong>of</strong> TSO <strong>and</strong> DSO operator functions<br />
– conditions related to the settlement <strong>of</strong> costs <strong>of</strong> system ma<strong>in</strong>tenance<br />