<strong>INSPECTION</strong> <strong>REPORT</strong> (1:2)<br />

Project:<br />

Site address:<br />

Doc Nr. 1 - maxit Quality Assurance System – Car Park Floor – for mFC<br />

Site manager: Quality supervisor:<br />

Date: Inspected by:<br />

GENERAL CONDITIONS<br />

Products:<br />

Machinery to be used:<br />

Programme for completion<br />

Area: m 2<br />

Thickness: mm<br />

Date Area/activity (defined) m 2<br />

WORKING CONDITIONS<br />

General conditions on site OK Remarks:<br />

Temperature Indoor: º C<br />

Floor: º C<br />

Water availability OK Remarks:<br />

Electricity OK Remarks:<br />

Other remarks:<br />

WORK <strong>INSPECTION</strong><br />

Items to be checked<br />

Quality Manager responsible<br />

MFC:<br />

PREPARATORY WORK /<br />

ASSESSMENT OF CONDITION<br />

- Type of substrate<br />

- Mapping of cracks in sub-floor<br />

- Rising damp<br />

- Absorbed oils/cutting fluids<br />

- Construction joints<br />

- Working joints<br />

- Cracks<br />

- Bonding in sub-floor<br />

- Sub-floor pull-off strength > 1.5 MPa (N/mm 2 )<br />

Check carried out by:<br />

As per signature:<br />

Requirement Date Signature Deviation


- Freshly cast concrete (≥ 28 days)<br />

- Test areas<br />

CLEANING<br />

- Vacuum cleaning<br />

- Shot-blast cleaning<br />

Doc Nr. 1 - maxit Quality Assurance System – Car Park Floor – for mFC


<strong>INSPECTION</strong> <strong>REPORT</strong> (2:2)<br />

Doc Nr. 1 - maxit Quality Assurance System – Car Park Floor – for mFC<br />

SUBSTRATE<br />

- Pull-off strength > 1.5 MPa (N/mm 2 )<br />

- Bonding/de-bonding<br />

- Joints<br />

- Need for fillings<br />

- Temperature > +10 C o<br />

- Curvature/Slope<br />

- Damp/Wetness<br />

SURVEYING FOR FLATNESS<br />

SEALING/EDGES<br />

PRIMING on to SUBSTRATE<br />

Priming: MD16 (Floor 4716) (1:5 and 1:3)<br />

Priming: MD 24 (Floor 4710)<br />

REINFORCEMENT - BOLTED<br />

- Steel net Ø 4 mm, mesh 150 mm<br />

LEVELLING<br />

- Priming between layers 1 and 2<br />

- Foam barriers<br />

- Taping of edges<br />

- Cutting of joints/profiles for<br />

construction joints<br />

- Gradient<br />

SUBSEQUENT ADJUSTMENTS<br />

- Checking flatness/curvature<br />

- Checking surface structure<br />

- Bonding<br />

SURFACE TREATMENT<br />

IMPREGNATION<br />

- Cleaning of surface ABS 410 (Floor<br />

4610) / ABS 430 (Floor 4630)<br />

- 1 st application of impregnation / coating<br />

- 2 nd application of impregnation / coating<br />

FINISHED Car Park FLOOR<br />

- Visual appearance:<br />

- Visual appearance: Overall<br />

- Pull-off strength<br />

- Bonding<br />

DIRECTIONS FOR MAINTENANCE<br />

For deviations see separate Non-Conformity Report


Signature of responsible Quality Manager MFC<br />

Signature of responsible Site Manager<br />

Doc Nr. 1 - maxit Quality Assurance System – Car Park Floor – for mFC<br />

Place, date<br />

Place, date


Doc Nr. 1 - maxit Quality Assurance System – Car Park Floor – for mFC