and fresh engineers inducted into operation and fine-tune their skills in operational emergencies together<br />
with tremendous integrated Unit experience, exposure and understanding <strong>of</strong> normal operations. NPTI has<br />
trained more than 7500 engineers and operators on these simulators since their installation. During the<br />
year 2009-10, 668 personnel ( 163 at Badarpur and505 at Nagpur) have been imparted training on these<br />
Simulators.<br />
16<br />
500 MW Thermal <strong>Power</strong> Plant Simulator at NPTI, Faridabad<br />
3.3 Combined Cycle Gas Turbine Simulator at NPTI, Faridabad<br />
A high quality, high fidelity real time 430 MW Combined Cycle Gas Turbine <strong>Power</strong> Plant Simulator has been<br />
set up at NPTI Corporate Office, Faridabad. The Simulator realistically emulates the behaviour <strong>of</strong> the entire<br />
process Simulator in real time scenario for a meaningful and <strong>of</strong>f-job operator training. This is a replica <strong>of</strong><br />
NTPC Faridabad Gas <strong>Power</strong> Plant, Siemens Make V-94.2 Model comprising <strong>of</strong> 2x143 MW Gas Turbines<br />
and 1x144 MW Steam Turbine. The CCGT replica simulator is equipped with all the CRT controls with latest<br />
state-<strong>of</strong>-the-art Barco Screens. The training on this Simulator benefited the operators and Shift Charge<br />
Engineers working or being posted on Combined Cycle <strong>Power</strong> Plants. 92 personnel have been trained on<br />
this Simulator since during 2009-10.<br />