04.08.2013 Views

Annual Report - Ministry of Power

Annual Report - Ministry of Power

Annual Report - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

and fresh engineers inducted into operation and fine-tune their skills in operational emergencies together<br />

with tremendous integrated Unit experience, exposure and understanding <strong>of</strong> normal operations. NPTI has<br />

trained more than 7500 engineers and operators on these simulators since their installation. During the<br />

year 2009-10, 668 personnel ( 163 at Badarpur and505 at Nagpur) have been imparted training on these<br />

Simulators.<br />

16<br />

500 MW Thermal <strong>Power</strong> Plant Simulator at NPTI, Faridabad<br />

3.3 Combined Cycle Gas Turbine Simulator at NPTI, Faridabad<br />

A high quality, high fidelity real time 430 MW Combined Cycle Gas Turbine <strong>Power</strong> Plant Simulator has been<br />

set up at NPTI Corporate Office, Faridabad. The Simulator realistically emulates the behaviour <strong>of</strong> the entire<br />

process Simulator in real time scenario for a meaningful and <strong>of</strong>f-job operator training. This is a replica <strong>of</strong><br />

NTPC Faridabad Gas <strong>Power</strong> Plant, Siemens Make V-94.2 Model comprising <strong>of</strong> 2x143 MW Gas Turbines<br />

and 1x144 MW Steam Turbine. The CCGT replica simulator is equipped with all the CRT controls with latest<br />

state-<strong>of</strong>-the-art Barco Screens. The training on this Simulator benefited the operators and Shift Charge<br />

Engineers working or being posted on Combined Cycle <strong>Power</strong> Plants. 92 personnel have been trained on<br />

this Simulator since during 2009-10.<br />

NATIONAL POWER TRAINING INSTITUTE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!