<strong>TECHNICAL</strong> <strong>BID</strong> <strong>EVALUATION</strong> <strong>CRITERIA</strong><br />

Evaluation of technical proposal<br />

<strong>ANNEX</strong> 7<br />

The set criteria for the evaluation of candidates and their corresponding points for the<br />

conduct of the project are given in Table 1. It is understood that all prospective suppliers<br />

have passed the eligibility requirement prior to the opening of technical bids.<br />

CODE<br />

Table 1. General Criteria<br />

CRITERION Document<br />

NO.<br />

Ref.<br />

A Track record/Experience of the company related to the Eligibility<br />

assignment<br />

forms<br />

B Responsiveness to the technical requirements of Bid<br />

documents (For Communal Facilities)<br />

1 Compliance with the standards set by RPP Compliance<br />

with<br />

standards<br />

2 Completeness of supplies BOQ<br />

3 Meet the minimum sizes Summary of<br />

sizing<br />

C Consistency on the required procurement, delivery and<br />

installation approach (for communal facilities)<br />

4 Technical bid specifies the approach, methodology for Workplan/Log<br />

procurement of goods, delivery and quality control<br />

istics Plan<br />

5 Provision of user’s and O & M manual with maintenance Compliance<br />

log sheet for each system installed (both for public and with<br />

private systems)<br />

standards<br />

6 Conducts training on operation and proper maintenance of Workplan/Co<br />

systems installed for the 30 barangays<br />

mpliance with<br />

standards<br />

7 Delivery schedule for communal facilities delivered,<br />

installed and commissioned/accepted within the said<br />

contract date<br />

Work plan<br />

8 Adequate and effective staffing Over-all<br />

management<br />

D Responsiveness to the technical requirements of Bid<br />

documents (household electrification)<br />

1 Compliance with the standards set by RPP Compliance<br />

with<br />

standards<br />

2 Required warranties in accordance with the technical Compliance<br />

specifications<br />

with<br />

standards<br />

Points<br />

10<br />

15<br />

35<br />

25


3 The proposal specifies the approach and methodology for<br />

procurement of goods, their delivery, and quality control<br />

4 The proposal commits to commercially market SHS equal<br />

to or larger than 20Wp and comply with RPP Project<br />

requirement for SHS<br />

5 The proposal includes a marketing plan that aims to install<br />

a minimum number of systems (20 Hhs/brgy)as set out in<br />

the Barangay Requirements within 9 months<br />

6 The proposal commits to make an appropriate consumer<br />

financing arrangement such as partnering with microfinance<br />

institutions or dealer financing<br />

E Adequacy of the submitted bids in responding to the Bid<br />

documents (after-sales service and maintenance)<br />

1 The required component warranties and a five-year system<br />

warranty for the public facilities are provided<br />

2 The proposal makes provision for equipment replacement,<br />

including adequate cover in bill of quantities<br />

3 The proposal include a plan and approach to ensure<br />

responsive after-sales services, including both schedule<br />

and break-down maintenance sermakes provision for<br />

equipment replacement, including adequate cover in bill of<br />

quantities<br />

Household<br />

electrification<br />

Plan<br />

Household<br />

electrification<br />

Plan<br />

Household<br />

electrification<br />

Plan<br />

Financing<br />

Scheme<br />

Description of<br />

Warranty<br />

Bill of<br />

quantities<br />

(communal<br />

facilities)<br />

Approach to<br />

after-sales<br />

and<br />

maintenance<br />

4 Adequate and effective staffing Staffing Plan<br />

TOTAL POINTS 100<br />