Download - Calpeda
Download - Calpeda
Download - Calpeda
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
a<br />
sa<br />
a<br />
sa<br />
a<br />
sa<br />
a<br />
sa<br />
BSV.F.<br />
with variable and fixed speed<br />
pumps (frequency converter<br />
into the control panel)<br />
Construction<br />
Pressure boosting sets with automatic<br />
operation, consisting of 1 variable<br />
speed pump with frequency converter<br />
into the control panel and from 1<br />
to 5 fixed speed pumps, assembled<br />
on a common baseplate, with suction<br />
and delivery manifolds, gate and<br />
non-return valves, pressure gauge,<br />
control panel and 20 litres diaphragm<br />
tank (on request).<br />
BS 1V1F<br />
2 pumps: pompe: 1variable 1 variabile<br />
1 fixed fissa<br />
Operation<br />
BS 1V2F<br />
2 pompe: 1 variabile<br />
2 fisse<br />
The control panel, with electronic card,<br />
manages the pump operation, the changeover<br />
of fixed speed pumps starting sequence<br />
Pumps starting is in a cascade sequence,<br />
with a signal from the pressure transducer.<br />
Constant pressure BS 1V1F is guaranteed by the<br />
2 pompe: 1 variabile<br />
variable speed pumps, while 1 fissa fixed speed<br />
pumps<br />
H<br />
start when the request is higher than<br />
the m capacity of BS the variable 1V1F speed pump.<br />
2 BS pumps: 1V1F 1variable<br />
2 pompe:<br />
1 fixed<br />
1 variabile<br />
1 fissa<br />
H<br />
m<br />
H set<br />
H<br />
m H<br />
m<br />
H set set<br />
BS 1V1F<br />
2 pompe: 1 variabile<br />
1 fissa<br />
BS 1V2F<br />
3 2 pumps: pompe: 1 1variable variabile<br />
2 fixed fisse<br />
V F<br />
3<br />
BS 1V2F Q m /h<br />
BS 3 pompe: 1V2F1<br />
variabile<br />
3 BS pumps: 1V2F 1variable 2 fisse<br />
3 pompe: 1 variabile<br />
2 fixed 2 fisse<br />
3 Q m /h<br />
3 Q m /h<br />
BSV<br />
with variable speed pumps<br />
(frequency converter into the<br />
control panel)<br />
Construction<br />
Pressure boosting sets with automatic<br />
operation, consisting of<br />
variable speed pumps (from 1 to 6)<br />
with frequency converter on the<br />
control panel, assembled on a<br />
common baseplate, with suction<br />
and delivery manifolds, gate and<br />
non-return valves, pressure transducer,<br />
pressure gauge, control<br />
panel and 20 litres diaphragm tank<br />
(on request). BS 2V<br />
2 variable pompe a speed velocità pumps variabile<br />
Operation<br />
The control panel, with electronic<br />
card, manages the pump operation,<br />
the changeover of pumps<br />
starting sequence.<br />
Pumps starting in a cascade<br />
sequence, BS with 2V a signal from the<br />
2 pompe a velocità variabile<br />
pressure transducer.<br />
H<br />
m<br />
H set<br />
H<br />
m H<br />
m<br />
H set<br />
BS 2V<br />
2 pompe a velocità variabile<br />
V V<br />
BS 3V<br />
3 pompe a velocità variabile<br />
BS 2V<br />
2BS variable 2V speed pumps<br />
2 pompe a velocità variabile<br />
3<br />
BS 3V Q m /h<br />
BS 3 pompe 3V a velocità variabile<br />
3BS variable 3V speed pumps<br />
3 pompe a velocità variabile<br />
3 Q m /h<br />
3 Q m /h<br />
367<br />
BSV.F.<br />
with variable speed pumps<br />
(on board frequency converter)<br />
Construction<br />
Pressure boosting sets with automatic<br />
operation, consisting of 1 variable<br />
speed pump with frequency converter<br />
into the control panel and from 1<br />
to 5 fixed speed pumps, assembled<br />
on a common baseplate, with suction<br />
and delivery manifolds, gate and<br />
non-return valves, pressure gauge,<br />
control panel and 20 litres diaphragm<br />
tank (on request).<br />
Operation<br />
The control panel, with electronic card,<br />
manages the pump operation, the changeover<br />
of fixed speed pumps starting sequence<br />
Pumps starting is in a cascade sequence,<br />
with a signal from the pressure transducer.<br />
Constant pressure is guaranteed by the<br />
variable speed BS pumps, 1V1F while fixed speed<br />
2 pompe: 1 variabile<br />
pumps start when the request 1 fissa is higher<br />
than the capacity of the variable speed<br />
H<br />
pump. m BS 1V1F<br />
2 BS pumps: 1V1F 1variable<br />
2 pompe:<br />
1 fixed<br />
1 variabile<br />
1 fissa<br />
H<br />
m<br />
H set<br />
H<br />
m H<br />
m<br />
H set<br />
BS 1V1F<br />
2 pompe: 1 variabile<br />
1 fissa<br />
3 pumps: pompe: 1variable 1 variabile<br />
2 fixed 2 fisse<br />
V F<br />
BS 1V2F<br />
3 pompe: 1 variabile<br />
2 fisse<br />
3<br />
BS 1V2F Q m /h<br />
BS 3 pompe: 1V2F 1 variabile<br />
3 BS pumps: 1V2F 1variable 2 fisse<br />
3 pompe: 1 variabile<br />
2 fixed 2 fisse<br />
3 Q m /h<br />
3 Q m /h<br />
BSV<br />
with variable speed pumps<br />
(on board frequency converter)<br />
Construction<br />
Pressure boosting sets with automatic<br />
operation, consisting of variable<br />
speed pumps (from 1 to 6) with frequency<br />
converter on the control<br />
panel, assembled on a common<br />
baseplate, with suction and delivery<br />
manifolds, gate and non-return valves,<br />
pressure transducer, pressure<br />
gauge, control panel and 20litres<br />
diaphragm tank (on request).<br />
Operation<br />
The control panel, with electronic<br />
card, manages the pump operation,<br />
the changeover of pumps<br />
starting sequence.<br />
Pumps starting in a cascade<br />
sequence, with a signal from the<br />
pressure BS transducer. 2V<br />
2 pompe a velocità variabile<br />
H<br />
m<br />
H set<br />
H<br />
m H<br />
m<br />
H set<br />
BS 2V<br />
2 pompe a velocità variabile<br />
INVERTER INVERTER INVERTER<br />
V V<br />
BS 3V<br />
3 pompe a velocità variabile<br />
INVERTER INVERTER INVERTER INVERTER<br />
F V FF V VV V FF V VV<br />
H set<br />
V F<br />
3 Q m /h<br />
H<br />
m<br />
H set<br />
V V<br />
BS 3V<br />
3 variable pompe a speed velocità pumps variabile<br />
3 Q m /h<br />
H set<br />
BS 1V1F<br />
2 pumps: pompe: 1variable 1 variabile<br />
1 fixed fissa<br />
V F<br />
BS 1V2F<br />
3 Q m /h<br />
H<br />
m<br />
H set<br />
BS 2V<br />
2 variable pompe a speed velocità pumps variabile<br />
INVERTER INVERTER INVERTER<br />
V V<br />
BS 3V<br />
3 variable pompe a speed velocità pumps variabile<br />
INVERTER INVERTER INVERTER INVERTER<br />
F V FF V VV V FF V VV<br />
BS 2V<br />
2BS variable 2V speed pumps<br />
2 pompe a velocità variabile<br />
3 Q m /h<br />
3<br />
BS 3V Q m /h<br />
BS 3 pompe 3V a velocità variabile<br />
3BS variable 3V speed pumps<br />
3 pompe a velocità variabile<br />
3 Q m /h<br />
3 Q m /h<br />
46