07.08.2013 Views

ALUMNI News - Fanshawe College

ALUMNI News - Fanshawe College

ALUMNI News - Fanshawe College

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

22<br />

Facing Oxford Street, west corner.<br />

UNDER CONSTRUCTION:<br />

A LOOK INSIDE<br />

If you’ve driven east on Oxford Street in London in the past three years, you’ve likely<br />

noticed the front face of <strong>Fanshawe</strong> <strong>College</strong> changing dramatically. Just west of<br />

what was B-Gym, a new Centre for ConstructionTrades and Technology has been<br />

constructed from the ground up. This inside look gives you a peak at the new twostorey<br />

high Plumbing Lab (just above) and the Electrical Wiring Lab (large photo on<br />

next page). Phase I also houses a 9,000 square foot Carpentry Shop with a 25-foot<br />

high ceiling that is big enough to build a complete house inside. Phase II, located<br />

directly east of Phase I where B-Gym was, will be ready in August 2006 featuring<br />

new classrooms, computer labs, drafting labs and academic space.<br />

<strong>Fanshawe</strong> <strong>College</strong> Alumni <strong>News</strong> Spring 2006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!