<strong>MDI</strong> transportation<br />

g u i d e l i n e s<br />

Suggested Checklist for Rail Tank Car Unloading<br />

15 ____ Make sure entire unloading operation is attended as required by 49 CFR § 174.67. It is<br />

recommended that two operators be available.<br />

For Pump Unloading:<br />

16 ____ Make sure all rail cars valves are closed, and carefully remove the outlet cap or plugs.<br />

17 ____ Connect a 2-inch hose made of a material suitable for transferring <strong>MDI</strong>, such as Teflon ®<br />

fluorocarbon or Viton ® fluoroelastomer from the rail car unloading valve to the 2-inch fitting of the<br />

unloading line pump.<br />

18 ____ Connect the 2-inch hose from the rail car vapor exchange connection to the vapor exchange line<br />

from the storage tank.<br />

19 ____ Open the valve at the pump and the rail cars unloading valve.<br />

20 ____ Allow the rail tank car pad pressure and liquid head to prime the suction side of the unloading pump.<br />

21 ____ Open the valves on the vapor exchange line and the rail car vapor valve.<br />

22 ____ Start the pump and operate until the rail car is empty or receiving tank is full as indicated by the<br />

movement in the unloading line hose and drop in gauge pressure.<br />

23 ____ Turn the pump off and then close the unloading line valves.<br />

24 ____ Blow the lines with nitrogen or dry air and then close the vapor exchange line valves.<br />

25 ____ Disconnect the unloading and vapor exchange hoses, and replace the caps and plugs on<br />

pipelines and hoses. Use suitable tool to tighten all caps and plugs.<br />

26 ____ Remove personal protective equipment.<br />

For Pressure Unloading:<br />

16 ____ Make sure all rail car valves are closed and carefully remove the outlet caps or plugs.<br />

17 ____ Connect the stainless steel or either Teflon ® fluorocarbon or Viton ® fluoroelastomer hose to the<br />

unloading valve on the rail car.<br />

18 ____ Use a 1-inch hose to connect a supply of oil-free, dry air or nitrogen (with dew point of -40ºF) to<br />

the rail car air/N2 valve.<br />

19 ____ Pressurize railcar with 35 psi maximum nitrogen or dry air and verify that it does not leak.<br />

20 ____ Open the storage tank vent valve to a suitable vent gas treatment system.<br />

Copyright 2001, <strong>American</strong> Plastics Council<br />

Appendix 3-3