12.08.2013 Views

flood risk assessment in connection with a planning - Breckland ...

flood risk assessment in connection with a planning - Breckland ...

flood risk assessment in connection with a planning - Breckland ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Flood Risk Assessment Tesco Supermarket, Swaffham<br />

1 INTRODUCTION<br />

1.1 Commission<br />

This Flood Risk Assessment has been commissioned to support a<br />

plann<strong>in</strong>g application <strong>in</strong> respect of the proposed Tesco supermarket at<br />

Castle Acre Road, Swaffham, Norfolk.<br />

This report is for the use of Millngate Swaffham Ltd/Tesco Stores Ltd<br />

(to whom alone is owed a duty of care) and their professional advisors<br />

and consultees; it may not be relied upon or reproduced by any third<br />

party for any use <strong>with</strong>out the prior written agreement of Jubb<br />

Consult<strong>in</strong>g Eng<strong>in</strong>eers Ltd.<br />

1.2 Objectives<br />

The objective of this Flood Risk Assessment Report is to be present a<br />

viable <strong>flood</strong> defence and surface water dra<strong>in</strong>age strategy address<strong>in</strong>g<br />

the potential impacts of develop<strong>in</strong>g the exist<strong>in</strong>g site <strong>in</strong>clud<strong>in</strong>g an<br />

<strong>assessment</strong> of <strong>flood</strong> <strong>risk</strong> as required by the Environment Agency as<br />

consultees to the Plann<strong>in</strong>g Authority.<br />

In summary this <strong>flood</strong> <strong>risk</strong> <strong>assessment</strong> assesses the follow<strong>in</strong>g –<br />

sources of <strong>flood</strong><strong>in</strong>g (<strong>in</strong>clud<strong>in</strong>g consideration of the potential<br />

pathways which may result <strong>in</strong> potential <strong>flood</strong> <strong>risk</strong>) to and from<br />

the site;<br />

control of onsite surface water;<br />

extent, location and adequacy of any exist<strong>in</strong>g defences;<br />

the effect of climate change on all possible sources of <strong>flood</strong><strong>in</strong>g;<br />

means of emergency escape and access;<br />

offsite <strong>flood</strong> <strong>risk</strong> (the effect of the proposals on the downstream<br />

environment);<br />

residual <strong>risk</strong>.<br />

Page 1<br />

Jubb Consult<strong>in</strong>g Eng<strong>in</strong>eers Limited February 2012<br />

P9632-G300C-Rep-120209-MH

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!