Table 2. <strong>Remediation</strong> <strong>Case</strong> <strong>Studies</strong>: Summary <strong>of</strong> Cost Data (continued)<br />
Key Factors<br />
Potentially Affecting Technology Costs<br />
Calculated Unit<br />
Cost for<br />
Treatment 1,2<br />
Quantity <strong>of</strong><br />
Contaminant<br />
Removed<br />
Quantity <strong>of</strong><br />
Media<br />
Treated<br />
Technology<br />
Cost ($) 1,2<br />
Site Name, State (Technology)<br />
Other In Situ Soil/Sediment Treatment<br />
Total volume <strong>of</strong> soil treated<br />
Not Provided $5,176/yd 3<br />
5 yd 3<br />
Total - $26,000<br />
P - $33,220<br />
Crooksville/Roseville Pottery Area<br />
<strong>of</strong> Concern (CRPAC)<br />
(Solidification/stabilization)<br />
Total - $4,000,000 6,480 ft 2 area Not Provided Not Provided Sampling showed system did not require O&M<br />
planned for a third year<br />
Paducah Gaseous Diffusion Plant<br />
(PGDP) Superfund Site (Lasagna TM )<br />
Operating time limited to two hours on either side<br />
<strong>of</strong> low tide when excavator was best suited for use<br />
Not Provided $229/yd 3<br />
2,450 yd 3<br />
Total - $561,154<br />
(includes equipment and<br />
chemical costs, and<br />
mobilization/<br />
demobilization)<br />
Koppers Co. (Charleston Plant)<br />
Ashley River Superfund Site<br />
Ex Situ Soil Treatment<br />
Thermal Desorption<br />
26,000 tons Not Provided $125/ton Stack gas particulate emissions required<br />
modifications to the system and performance <strong>of</strong> a<br />
fourth test run<br />
Total: $3,260,517<br />
C - $429,561<br />
AO - $2,830,956<br />
Site B (actual site name confidential)<br />
(Thermal Desorption)<br />
P - Total -$1,500,000 3,050 lbs Not Provided P -$0.90/lb Increased moisture content <strong>of</strong> waste increased<br />
processing time, electrical costs, and production <strong>of</strong><br />
wastewater<br />
Brookhaven National Laboratory<br />
(BNL) (Thermal Desorption)<br />
Modification <strong>of</strong> HEPA filter housing to address<br />
elevated levels <strong>of</strong> particulate emissions<br />
Not Provided $292/yd 3<br />
C and AO - $15,700,000 53,685 yd 3<br />
Industrial Latex Superfund Site<br />
(Thermal Desorption)<br />
In Situ Groundwater Treatment<br />
Bioremediation<br />
Not Provided Not Provided Not Provided Cost for acquiring mulch<br />
C - $165,000<br />
AO - $51,000<br />
Future AO estimated to<br />
be $42,000<br />
Altus Air Force Base, Landfill 3 (LF<br />
3) (Bioremediation)<br />
Not Provided Not Provided Not Provided Cost for acquiring mulch<br />
$360/ linear ft to install<br />
biowall<br />
Offutt Air Force Base<br />
(Bioremediation)<br />
9