Table 2. <strong>Remediation</strong> <strong>Case</strong> <strong>Studies</strong>: Summary <strong>of</strong> Cost Data (continued)<br />

Key Factors<br />

Potentially Affecting Technology Costs<br />

Calculated Unit<br />

Cost for<br />

Treatment 1,2<br />

Quantity <strong>of</strong><br />

Contaminant<br />

Removed<br />

Quantity <strong>of</strong><br />

Media<br />

Treated<br />

Technology<br />

Cost ($) 1,2<br />

Site Name, State (Technology)<br />

Other In Situ Soil/Sediment Treatment<br />

Total volume <strong>of</strong> soil treated<br />

Not Provided $5,176/yd 3<br />

5 yd 3<br />

Total - $26,000<br />

P - $33,220<br />

Crooksville/Roseville Pottery Area<br />

<strong>of</strong> Concern (CRPAC)<br />

(Solidification/stabilization)<br />

Total - $4,000,000 6,480 ft 2 area Not Provided Not Provided Sampling showed system did not require O&M<br />

planned for a third year<br />

Paducah Gaseous Diffusion Plant<br />

(PGDP) Superfund Site (Lasagna TM )<br />

Operating time limited to two hours on either side<br />

<strong>of</strong> low tide when excavator was best suited for use<br />

Not Provided $229/yd 3<br />

2,450 yd 3<br />

Total - $561,154<br />

(includes equipment and<br />

chemical costs, and<br />

mobilization/<br />

demobilization)<br />

Koppers Co. (Charleston Plant)<br />

Ashley River Superfund Site<br />

Ex Situ Soil Treatment<br />

Thermal Desorption<br />

26,000 tons Not Provided $125/ton Stack gas particulate emissions required<br />

modifications to the system and performance <strong>of</strong> a<br />

fourth test run<br />

Total: $3,260,517<br />

C - $429,561<br />

AO - $2,830,956<br />

Site B (actual site name confidential)<br />

(Thermal Desorption)<br />

P - Total -$1,500,000 3,050 lbs Not Provided P -$0.90/lb Increased moisture content <strong>of</strong> waste increased<br />

processing time, electrical costs, and production <strong>of</strong><br />

wastewater<br />

Brookhaven National Laboratory<br />

(BNL) (Thermal Desorption)<br />

Modification <strong>of</strong> HEPA filter housing to address<br />

elevated levels <strong>of</strong> particulate emissions<br />

Not Provided $292/yd 3<br />

C and AO - $15,700,000 53,685 yd 3<br />

Industrial Latex Superfund Site<br />

(Thermal Desorption)<br />

In Situ Groundwater Treatment<br />

Bioremediation<br />

Not Provided Not Provided Not Provided Cost for acquiring mulch<br />

C - $165,000<br />

AO - $51,000<br />

Future AO estimated to<br />

be $42,000<br />

Altus Air Force Base, Landfill 3 (LF<br />

3) (Bioremediation)<br />

Not Provided Not Provided Not Provided Cost for acquiring mulch<br />

$360/ linear ft to install<br />

biowall<br />

Offutt Air Force Base<br />

(Bioremediation)<br />

9