Soil Vapor Extraction (SVE) and Monitored Natural Attenuation (MNA) at Three<br />

Drycleaner Sites, Various Locations (continued)<br />

Regulatory Requirements/Cleanup Goals:<br />

Soil<br />

For two sites, cleanup goals were based on state regulatory standards which included 0.03 mg/kg leachable PCE. For<br />

the third site, the cleanup goal for soil was the U.S. EPA target risk range (actual values not specified).<br />

Groundwater<br />

Cleanup goals were based on drinking water MCLs, which was specified for 2 sites as 3.0 µg/L for PCE and TCE,<br />

70 µg/L for cis-1,2-DCE, 100 µg/L for trans-1,2-DCE, and 1.0 µg/L for vinyl chloride.<br />

Results:<br />

All the sites reported that SVE reduced PCE in soils to below cleanup levels.<br />

Two sites (Dry Clean Inn and Former Dollar Cleaners) reported that contaminant concentrations in groundwater were<br />

below cleanup target levels in the last two monitoring events. Both sites received Site Rehabilitation Completion<br />

Orders. No information was provided on the results <strong>of</strong> MNA at the third site.<br />

Costs:<br />

Design and implementation costs for SVE systems ranged from $109,000 to $135,000, and annual O&M costs for SVE<br />

systems ranged from $28,000 to $30,000.<br />

Description:<br />

SVE and MNA was conducted at three drycleaner sites contaminated with chlorinated solvents from leaks, spills, or<br />

dumping <strong>of</strong> drycleaning solvents or wastewaters. All three sites reported that SVE reduced PCE concentrations in soil to<br />

below cleanup levels. Two sites reported that contaminant concentrations in groundwater had been reduced by MNA to<br />

below cleanup levels in the last two monitoring events. Both sites received Site Rehabilitation Completion Orders.<br />

Information on groundwater contaminant concentrations for the third site was not provided. Reported design and<br />

maintenance costs for SVE ranged from $109,00 to $135,000. Reported O&M costs for SVE systems ranged from $28,000<br />

to $30,000.<br />