Table 2. <strong>Remediation</strong> <strong>Case</strong> <strong>Studies</strong>: Summary <strong>of</strong> Cost Data (continued)<br />
Key Factors<br />
Potentially Affecting Technology Costs<br />
Calculated Unit<br />
Cost for<br />
Treatment 1,2<br />
Quantity <strong>of</strong><br />
Contaminant<br />
Removed<br />
Quantity <strong>of</strong><br />
Media<br />
Treated<br />
Technology<br />
Cost ($) 1,2<br />
Site Name, State (Technology)<br />
Other In Situ Groundwater Treatment<br />
Not Provided Not Provided Not Provided Not Provided Value <strong>of</strong> land, proximity <strong>of</strong> land to contaminant<br />
source, climate, and influent volume and chemistry<br />
Clear Creek/Central City Superfund<br />
site (Phytoremediation)<br />
Presence <strong>of</strong> unexploded ordnance (UXO) affected<br />
design and operation <strong>of</strong> demonstration<br />
Total: $209,900 Not Provided Not Provided $19/lb <strong>of</strong> ZVI<br />
injected<br />
Marshall Space Flight Center<br />
(Chemical Oxidation/Reduction (in<br />
situ))<br />
Not Provided Not Provided Ineeda Cleaners: Extensive system maintenance<br />
required<br />
Swift<br />
Cleaners -<br />
157,500 -<br />
202,500 ft 3<br />
(actual<br />
treatment<br />
volume)<br />
Information<br />
not provided<br />
for Ineeda<br />
Cleaners<br />
DI - Ineeda Cleaners -<br />
$100,900; Swift Cleaners<br />
- $245,000<br />
Multiple (2) Dry Cleaner Sites - In<br />
Situ Chemical Oxidation (Chemical<br />
Oxidation/Reduction (in situ))<br />
D - Total: $1,000,000 Not Provided Not Provided Not Provided Technology reported as cost competitive with<br />
life-cycle cost <strong>of</strong> pump and treat over a 30-year<br />
period <strong>of</strong> comparison<br />
Cape Canaveral Air Force Station,<br />
Launch Complex 34 (Chemical<br />
Oxidation/Reduction (in situ))<br />
Not Provided Not Provided Not Provided Depth <strong>of</strong> affected aquifer and length <strong>of</strong> PRB<br />
M<strong>of</strong>fett:<br />
Total: $802,375<br />
C - $652,375<br />
AO - $150,000<br />
Dover:<br />
Total: $739,000<br />
Pre-construction<br />
activities: $365,000<br />
PRB construction:<br />
$374,000<br />
Multiple DoD Sites (Permeable<br />
Reactive Barrier)<br />