Table 2. <strong>Remediation</strong> <strong>Case</strong> <strong>Studies</strong>: Summary <strong>of</strong> Cost Data (continued)<br />

Key Factors<br />

Potentially Affecting Technology Costs<br />

Calculated Unit<br />

Cost for<br />

Treatment 1,2<br />

Quantity <strong>of</strong><br />

Contaminant<br />

Removed<br />

Quantity <strong>of</strong><br />

Media<br />

Treated<br />

Technology<br />

Cost ($) 1,2<br />

Site Name, State (Technology)<br />

Other In Situ Groundwater Treatment<br />

Not Provided Not Provided Not Provided Not Provided Value <strong>of</strong> land, proximity <strong>of</strong> land to contaminant<br />

source, climate, and influent volume and chemistry<br />

Clear Creek/Central City Superfund<br />

site (Phytoremediation)<br />

Presence <strong>of</strong> unexploded ordnance (UXO) affected<br />

design and operation <strong>of</strong> demonstration<br />

Total: $209,900 Not Provided Not Provided $19/lb <strong>of</strong> ZVI<br />

injected<br />

Marshall Space Flight Center<br />

(Chemical Oxidation/Reduction (in<br />

situ))<br />

Not Provided Not Provided Ineeda Cleaners: Extensive system maintenance<br />

required<br />

Swift<br />

Cleaners -<br />

157,500 -<br />

202,500 ft 3<br />

(actual<br />

treatment<br />

volume)<br />

Information<br />

not provided<br />

for Ineeda<br />

Cleaners<br />

DI - Ineeda Cleaners -<br />

$100,900; Swift Cleaners<br />

- $245,000<br />

Multiple (2) Dry Cleaner Sites - In<br />

Situ Chemical Oxidation (Chemical<br />

Oxidation/Reduction (in situ))<br />

D - Total: $1,000,000 Not Provided Not Provided Not Provided Technology reported as cost competitive with<br />

life-cycle cost <strong>of</strong> pump and treat over a 30-year<br />

period <strong>of</strong> comparison<br />

Cape Canaveral Air Force Station,<br />

Launch Complex 34 (Chemical<br />

Oxidation/Reduction (in situ))<br />

Not Provided Not Provided Not Provided Depth <strong>of</strong> affected aquifer and length <strong>of</strong> PRB<br />

M<strong>of</strong>fett:<br />

Total: $802,375<br />

C - $652,375<br />

AO - $150,000<br />

Dover:<br />

Total: $739,000<br />

Pre-construction<br />

activities: $365,000<br />

PRB construction:<br />

$374,000<br />

Multiple DoD Sites (Permeable<br />

Reactive Barrier)<br />

11