<strong>Finksburg</strong> <strong>Corridor</strong> <strong>Plan</strong><br />
3. Construct bicycle and pedestrian connections between neighborhoods and between<br />
the commercial center, residential areas, and activity centers<br />
Undetermined Impact: The cost to construct trails ranges from $100,000 per mile<br />
for a 6’ wide trail located on parkland to $500,000 per mile (including<br />
acquisition, construction and shoulder widening) for an 8-10’ wide trail located<br />
alongside a road. The proposed Roaring Run trail is approximately 19,000 feet<br />
(3.6 miles) in length and could, therefore, cost about $2,000,000 to construct,<br />
with additional money for land acquisition needed if land cannot be gained in full<br />
from developers.<br />
4. Construct sidewalks to improve pedestrian access, circulation, and safety<br />
Undetermined Impact: While there likely would be a cost associated with the<br />
implementation of this recommendation, the project needs more development<br />
before a reasonable cost estimate can be determined.<br />
5. Work with the SHA to conduct a traffic engineering study on MD 140 through the<br />
<strong>Finksburg</strong> community to analyze vehicle speeds and develop remedies for real or<br />
perceived speed issues within its scope as a principal arterial and with the objective of<br />
enhancing functionality, increasing safety and addressing conveyance problems.<br />
No Fiscal Impact<br />
6. Provide commuter service to the Baltimore and Washington metropolitan areas<br />
Undetermined Impact: While there likely would be a cost associated with the<br />
implementation of this recommendation, the project needs more development<br />
before a reasonable cost estimate can be determined.<br />
7.6. Promote the use of the Maryland Midland Railway by local industry<br />
No Fiscal Impact<br />
Environmental Sensitivity<br />
1. Explore the feasibility of and options for developing a community wastewater system<br />
to address existing problem areas, promote environmentally friendly redevelopment,<br />
and provide greater protection for water quality in the <strong>Finksburg</strong> area<br />
Undetermined Impact: The cost associated with this recommendation could be<br />
two-fold. The first cost to be borne would be that of conducting the study to<br />
determine the appropriate users, size and location of a community sewerage<br />
system. Once that is determined, the second cost to be borne would be the actual<br />
construction of such a facility. Because so many variables that would be involved<br />
in this process are unknown at this time, it is impossible to determine the fiscal<br />
impact that implementation of this recommendation might have. However, the<br />
cost to conduct the initial study can reasonably be estimated at around $100,000.<br />
2. Encourage the use of technologies, in new construction and retrofit projects, that<br />
employ water conservation measures that strive for zero stormwater and wastewater<br />
discharge<br />
No Fiscal Impact<br />
Approved by <strong>Carroll</strong> <strong>County</strong> <strong>Plan</strong>ning & Zoning Commission - October 2010Revised Draft – November 2012 ♦ 60