Save time and money Service manual Danfoss ... - Danfoss.com
Save time and money Service manual Danfoss ... - Danfoss.com
Save time and money Service manual Danfoss ... - Danfoss.com
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Oil pumps<br />
Oil pumps – BFP<br />
BFP – st<strong>and</strong>ard pump Relevant <strong>Danfoss</strong> types<br />
Type Code no.<br />
1-2<br />
pipe<br />
Type Code no. Comments/accessories<br />
BFP 11 L3 071N0101 2 ➨ BFP 11 L3 071N01413) BFP 21 L3 071N0102 2 ➨ BFP 21 L3 071N0170<br />
BFP 11 L3 071N0103 2 ➨ BFP 21 L3 071N0170<br />
BFP 21 L3 071N0104 2 ➨ BFP 21 L3 071N0170<br />
BFP 11 L5 071N0105 2 ➨ BFP 21 L5 071N0172<br />
BFP 21 L3 071N0107 2 ➨ BFP 21 L3 071N0170<br />
BFP 20 L3 071N0108 1 ➨ BFP 20 L3 071N01682) BFP 21 R3 071N0109 2 ➨ BFP 21 R3 071N0171<br />
Any hydraulic cylinder must be connected<br />
to the pressure gauge port on the front.<br />
BFP 21 L3 071N0111 2 ➨ BFP 21 L3 071N0170<br />
BFP 21 R3 071N0112 2 ➨ BFP 21 R3 071N0171<br />
BFP 21 L3 071N0113 2 ➨ BFP 21 L3 071N0170<br />
BFP 11 L3 071N0114 2 ➨ BFP 21 L3 071N0170 + coupling with single flat in hole (D-shaped)<br />
BFP 31 L3 071N0115 2 ➨ BFP 21 L3 071N0170<br />
BFP 21 L5 071N0116 2 ➨ BFP 21 L5 071N0172<br />
Any hydraulic cylinder must be connected<br />
to the pressure gauge port on the front.<br />
BFP 20 R3 071N0118 1 ➨ BFP 20 R3 071N01692) BFP 21 L3 071N0119 2 ➨ BFP 21 L3 071N0170<br />
BFP 21 R5 071N0120 1 ➨ BFP 21 R5 071N01732) BFP 21 L3 071N0122 1 ➨ BFP 21 L3 071N01702) BFP 21 L3 071N0123 2 ➨ BFP 21 L3 071N0170 + coil 110 V: 071N0061<br />
BFP 20 L3 071N0125 2 ➨ BFP 20 L3 071N0168<br />
BFP 20 L5 071N0126 2 ➨ BFP 20 L5 071N0126<br />
BFP 20 L3 071N0127 1 ➨ BFP 20 L3 071N01682) BFP 20 R3 071N0128 1 ➨ BFP 20 L3 071N01692) BFP 20 R5 071N0129 2 ➨ BFP 20 R5 071N0129<br />
2) This pump is delivered for 2-pipe operation. A changeover to 1-pipe operation is possible, see Changeover 1 - 2 pipe.<br />
3) This pump is delivered for 1-pipe operation. A changeover to 2-pipe operation is possible, see Changeover 1 - 2 pipe.<br />
14