policy and procedure manual - Clinical Engineering - Duke University
policy and procedure manual - Clinical Engineering - Duke University
policy and procedure manual - Clinical Engineering - Duke University
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
POLICY:<br />
POLICY AND PROCEDURE MANUAL<br />
DUKE UNIVERSITY HEALTH SYSTEM<br />
<strong>Clinical</strong> <strong>Engineering</strong> Policy CE-016<br />
New Employee Orientation<br />
All new employees must successfully complete the activities that are contained within the “Orientation<br />
Training Plan”.<br />
PURPOSE:<br />
To ensure that all new employees are properly prepared to accomplish their assigned tasks in a safe,<br />
efficient, <strong>and</strong> effective manner.<br />
To ensure that all new employees become acclimated to all pertinent plans <strong>and</strong> policies within <strong>Duke</strong><br />
<strong>University</strong> Healthcare System.<br />
PROCEDURE:<br />
1. Each new employee will read the Policy <strong>and</strong> Procedure Manual.<br />
2. Each new employee will be assigned a mentor the appropriate Manager. The mentor will work<br />
closely with the new employee during the orientation period to assure that all of the criteria of the<br />
orientation training plan are being met on schedule.<br />
3. The orientation training plan items will be signed off on, when completed, by the new employee on<br />
the “Orientation Plan Worksheet”.<br />
The Orientation Worksheet will be filed in the new employee’s Departmental Personnel File when all of<br />
the criteria have been met <strong>and</strong> signed off.<br />
Reviewed: November 2001, January 2004, May 2006, January 2007, January 2010, February 2013<br />
Revised: November 1999, May 2006, January 2010<br />
Page 1
<strong>Duke</strong> <strong>University</strong> Health System – <strong>Clinical</strong> <strong>Engineering</strong> Department<br />
Orientation Plan Worksheet<br />
Name: _______________________________ Primary Trainer: ____________________<br />
Date Training Began: ______________ Estimated Date of Completion: ______________<br />
DOCUMENTATION RECORDS<br />
Completion Employee’s Trainer<br />
Date Initials Initials<br />
Ordering Parts ______________ __________ __________<br />
Purchase Requisitions ______________ __________ __________<br />
Shipping Procedures ______________ __________ __________<br />
Name Tag & Dress Code ______________ __________ __________<br />
Daily Time Report ______________ __________ __________<br />
Monthly Status Reports ______________ __________ __________<br />
Time Sheet /Report Express ______________ __________ __________<br />
Telephone Protocol ______________ __________ __________<br />
Corrective work orders ______________ __________ __________<br />
PM work orders ______________ __________ __________<br />
Special Request work orders ______________ __________ __________<br />
Initial Inspection Procedure ______________ __________ __________<br />
Device Incidents ______________ __________ __________<br />
ADMINISTRATIVE FUNCTIONS<br />
Hospital Orientation ______________ __________ __________<br />
Performance Partnership System ______________ __________ __________<br />
Continuous Quality Improvement ______________ __________ __________<br />
Team Coverage ______________ __________ __________<br />
Time Off Policy ______________ __________ __________<br />
Sick Call Policy ______________ __________ __________<br />
Work Rules/Disciplinary Action ______________ __________ __________<br />
Fire Safety Response ______________ __________ __________<br />
Disaster Drill Response ______________ __________ __________<br />
Departmental Safety ______________ __________ __________<br />
Protective Equipment ______________ __________ __________<br />
Computer Work Rules ______________ __________ __________<br />
4 Rivers CMMS Operation ______________ __________ __________<br />
Lotus Notes ______________ __________ __________<br />
Page 2
TEST EQUIPMENT<br />
Defibrillator Analyzer ______________ __________ __________<br />
Electrical Safety Analyzers ______________ __________ __________<br />
ESU Analyzer ______________ __________ __________<br />
NIBP Analyzer ______________ __________ __________<br />
Oscilloscope ______________ __________ __________<br />
Patient Simulators ______________ __________ __________<br />
Other ______________ __________ __________<br />
Page 3