Manufacturing Process<br />
To ensure the accuracy and precision of the manufacturing process, <strong>Sterlite</strong> has a state of-the-art plant with top of the line<br />
machines enabling control of critical process and quality parameters. All <strong>Sterlite</strong> production lines are backed up with strong quality<br />
assurance systems. This is done by ensuring that all process and test equipments are periodically calibrated with defined<br />
benchmarks.<br />
Quality Tests<br />
The following tests are performed randomly to ensure a better quality:<br />
Degree of Cross linking for the Dielectric Void and contamination test involving microscopic inspection of imperfections of<br />
the insulation<br />
Bonding test of insulation screen with the insulation<br />
Online Diameter and eccentricity measurement and control by X-Ray unit, to ensure consistency and accuracy of Insulated<br />
core.<br />
Further, all Cables produced are subjected to the following routine tests as per IS 7098 (Part-2):1985:<br />
High Voltage test<br />
Conductor Resistance test<br />
Partial Discharge test<br />
Tests on conductors<br />
Tests on Armour<br />
Test for dimensions of insulation and sheath<br />
Physical tests for insulation<br />
Physical tests for outer sheath<br />
Partial Discharge<br />
Bending test followed by partial discharge<br />
Dielectric Power Factor test as a function of voltage<br />
Dielectric Power Factor test as a function of Temperature<br />
Insulation Resistance (Volume Resistivity test)<br />
Heating cycle test<br />
Impulse withstand test<br />
High Voltage test (4 hours)<br />
Flammability<br />
Issued: June 2012 2