HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

14. Quick opening facility shall be available in manual mode also.<br />

15. The actuator shall be AUDCO or imported and the approved manufacturers are BETTIS<br />

(USA), KTM (JAPAN), ROTARK (UK), BIFFI(ITALY), HYTORQ(UK),<br />

ELOMATIC(HOLLAND), NELES-JAMESBERY, TYCO-KEYSTONE<br />

16. The valve shall be metal seated Pressure balanced Ball valve with API monogram.<br />

17. THIRD PARTY INSPECTION<br />

Manufacturers test certificate shall be produced from the original manufacturer for the<br />

imported actuator.<br />

Proof of import also shall be verified by the third party inspection agency and the valves<br />

identified.<br />

The total assembly shall be offered for inspection to one of the Third Party Inspection<br />

agencies.<br />

SCOPE OF INSPECTION:<br />

A. Visual inspection.<br />

B. Dimensional check.<br />

C. Scrutiny of material test certificates.<br />

D. Performance test.<br />

18. DELIVERY PERIOD:<br />

Deliveries shall be made within 16 Weeks from the date of receipt of LOI / PO / advice from Sr.<br />

Manager – LPG Projects. Commissioning shall be within 15 days of advise.<br />

19. OPERATING CONDITIONS<br />

SERVICE WATER<br />

SP. GRAVITY 1.0<br />

UNITS : FLOW/PRESSURE CU.M./HR.<br />

KG/SQ. CM.<br />

INLET PRESSURE 10KG/SQ. CM.<br />

INLET TEMPERATURE 50 DEGREE C<br />

PRESSURE DROP MAX/MIN MIN. NEGLIGIBLE