INSTRUCTIONS TO BIDDERS<br />
1 Brief Scope of Work<br />
The scope of work includes (but not limited to) the Design, Engineering, Supply & Material<br />
procurement, Fabrication, Assembly, Painting, Inspection at manufacturers works, Supply &<br />
Delivery to site, Installation and Commissioning of REMOTE OPERATED VALVES at<br />
Mysore & Hubli LPG Bottling Plant project Site, HPCL<br />
Offered equipment and accessories shall meet all statutory requirements. Necessary<br />
documents supporting statutory approvals shall be submitted along with the un-priced bid.<br />
2 Delivery Period<br />
16 WEEKS for the supply of the equipment-from the date of issue of PO/LOI for complete<br />
supply work as per SOQ and 15 days for commissioning from the date of advise from EIC.<br />
Delivery at site shall be considered as date of delivery for supply. LD as per GTC will be<br />
applicable supply and commissioning separately as per above delivery periods.<br />
3 Information/Documents required along with Application:<br />
a) Title, style and postal address of the firm.<br />
b) Communication particulars including telephone numbers, fax numbers and e-mail address.<br />
4. Part Order<br />
HPCL reserves the right to accept any tender in whole or in part or reject any or all tenders<br />
without assigning any reason. HPCL reserves right to accept any or more tenders in part.<br />
Decision of HPCL in this regard shall be final and binding on the bidder.<br />
Special Instructions to Bidders<br />
1. The third party inspection agency (TPIA) for the entire work will be arranged by the Bidder.<br />
2. Vendor shall submit tentative detailed Quality assurance plan (QAP) for stage wise<br />
inspection. The detailed QAP will be drawn up after finalisation of the order along with the<br />
TPIA. Vendor to incorporate the comments and observations made byHPCL and<br />
execute the same at no EXTRA COST to HPCL.<br />
3 Bid Clarifications/Amendments By HPCL<br />
3.1 HPCL may issue clarifications / amendments in the form of addendum / corrigendum<br />
during the bidding period and may also issue amendments subsequent to receiving the bids.<br />
For the addendum / corrigendum issued during the bidding period, bidders shall confirm<br />
the inclusion of addendum / corrigendum in their bid. Bidders shall follow the instructions<br />
issued along with addendum / corrigendum.<br />
3.2 Bidders shall examine the bidding documents thoroughly and submit to HPCL any<br />
apparent conflict, discrepancy or error. HPCL shall issue appropriate clarifications or