Transport to work site /Recommendations on compaction<br />
∗ Only attach suitable tackle at the central lifting point (16) provided. The<br />
central lifting point is located exactly above the centre of gravity of the<br />
machine. The central lifting point can be displaced rearwards (18),<br />
given an application in which the height of the machine is of<br />
importance (torque wrench setting = 85 Nm).<br />
∗ During transport on the loading area of a vehicle, tie down the vibration<br />
plate using the lugs (17).<br />