IUOE News - Fall 2011
IUOE News - Fall 2011
IUOE News - Fall 2011
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Out<br />
with<br />
the<br />
old...<br />
Step 1: Demolition<br />
When ships are loaded with coal or potash, the conveyor belt<br />
has to be repositioned several times. However, the materials<br />
from the stockpile run continuously. The surge bin holds the<br />
material while the conveyor belt is moved.<br />
The demo division at the Pacific Group of Companies had to<br />
remove an outdated surge bin at Neptune Terminals in North<br />
Vancouver in preparation for a new one soon to arrive.<br />
—Photos by Peter Palm<br />
Turn the page to see Step 2: Replacement<br />
September <strong>2011</strong> <strong>News</strong> 3