Table S.2. Conclusions<br />
Topic Conclusion<br />
National Economic<br />
Development (NED)<br />
The 2002 recommended plan is the NED plan.<br />
Section 404 of the Clean The project has been evaluated in accordance with Section 404 of the<br />
Water Act and<br />
Clean Water Act and the Section 404(b)(1) Guidelines. The<br />
Section 404 (b)(1)<br />
Guidelines<br />
project is in full compliance.<br />
Section 10 of the Rivers The proposed work would not obstruct navigable waters of the United<br />
and Harbor Act of <strong>St</strong>ates. The proposed action has been subject to a public notice,<br />
1899<br />
a public hearing, and other evaluations normally conducted for<br />
activities subject to the Act. The project is in full compliance.<br />
Section 401 of the Clean WQ Certification was issued via letter dated June 9, 2003. The Corps<br />
Water Act – (Water will continue to coordinate closely with MDNR in regard to the<br />
Quality<br />
existing WQ Certification. Ultimately, MDNR will make the<br />
Certification)<br />
determination under its delegated authority whether the WQ<br />
Certification requires modification.<br />
Executive Order 11988, The proposed project is responsive to the planning objectives and is<br />
Floodplain<br />
Management<br />
Findings<br />
consistent with the requirements of Executive Order 11988<br />
Executive Order 11990, Direct impacts to wetlands are avoided and/or minimized and<br />
Protection of<br />
unavoidable impacts to jurisdictional wetland status are<br />
<strong>Wetlands</strong> Findings compensated.<br />
Cultural Resources No impacts to cultural resources are anticipated from construction of<br />
the flood damage reduction features. Additional cultural<br />
resources surveys would be required as compensatory mitigation<br />
lands are acquired and developed.<br />
Freshwater Mussels The Corps will continue to work closely with the Missouri<br />
Department of Conservation (MDC) and the U.S. Fish and<br />
Wildlife Service (USFWS) to determine avoid and minimize<br />
measures and long term monitoring of freshwater mussel<br />
resources.<br />
<strong>Endangered</strong> <strong>Species</strong> No impacts to Federally endangered or threatened species are<br />
anticipated.<br />
Significant Fish and Impacts to significant fish and wildlife resources are fully<br />
Wildlife Resources compensated.<br />
Operation of the <strong>New</strong> No impacts to the operation of the <strong>New</strong> <strong>Madrid</strong> Floodway during<br />
<strong>Madrid</strong> Floodway major flood events are anticipated.<br />
Food Security Act of Construction of the project would not impact eligibility of farmland<br />
1985 (Swampbuster that is currently enrolled in the farm program. Swampbuster<br />
Provisions)<br />
provisions do not impact the overall project economics.<br />
Draft <strong>RSEIS</strong> 2<br />
ix