Table S.2. Conclusions<br />

Topic Conclusion<br />

National Economic<br />

Development (NED)<br />

The 2002 recommended plan is the NED plan.<br />

Section 404 of the Clean The project has been evaluated in accordance with Section 404 of the<br />

Water Act and<br />

Clean Water Act and the Section 404(b)(1) Guidelines. The<br />

Section 404 (b)(1)<br />

Guidelines<br />

project is in full compliance.<br />

Section 10 of the Rivers The proposed work would not obstruct navigable waters of the United<br />

and Harbor Act of <strong>St</strong>ates. The proposed action has been subject to a public notice,<br />

1899<br />

a public hearing, and other evaluations normally conducted for<br />

activities subject to the Act. The project is in full compliance.<br />

Section 401 of the Clean WQ Certification was issued via letter dated June 9, 2003. The Corps<br />

Water Act – (Water will continue to coordinate closely with MDNR in regard to the<br />

Quality<br />

existing WQ Certification. Ultimately, MDNR will make the<br />

Certification)<br />

determination under its delegated authority whether the WQ<br />

Certification requires modification.<br />

Executive Order 11988, The proposed project is responsive to the planning objectives and is<br />

Floodplain<br />

Management<br />

Findings<br />

consistent with the requirements of Executive Order 11988<br />

Executive Order 11990, Direct impacts to wetlands are avoided and/or minimized and<br />

Protection of<br />

unavoidable impacts to jurisdictional wetland status are<br />

<strong>Wetlands</strong> Findings compensated.<br />

Cultural Resources No impacts to cultural resources are anticipated from construction of<br />

the flood damage reduction features. Additional cultural<br />

resources surveys would be required as compensatory mitigation<br />

lands are acquired and developed.<br />

Freshwater Mussels The Corps will continue to work closely with the Missouri<br />

Department of Conservation (MDC) and the U.S. Fish and<br />

Wildlife Service (USFWS) to determine avoid and minimize<br />

measures and long term monitoring of freshwater mussel<br />

resources.<br />

<strong>Endangered</strong> <strong>Species</strong> No impacts to Federally endangered or threatened species are<br />

anticipated.<br />

Significant Fish and Impacts to significant fish and wildlife resources are fully<br />

Wildlife Resources compensated.<br />

Operation of the <strong>New</strong> No impacts to the operation of the <strong>New</strong> <strong>Madrid</strong> Floodway during<br />

<strong>Madrid</strong> Floodway major flood events are anticipated.<br />

Food Security Act of Construction of the project would not impact eligibility of farmland<br />

1985 (Swampbuster that is currently enrolled in the farm program. Swampbuster<br />

Provisions)<br />

provisions do not impact the overall project economics.<br />

Draft <strong>RSEIS</strong> 2<br />

ix