DELFOR Delivery Schedule Message - Eurofer
DELFOR Delivery Schedule Message - Eurofer
DELFOR Delivery Schedule Message - Eurofer
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
UN/EDIFACT D97.A <strong>DELFOR</strong> - <strong>Delivery</strong> schedule message<br />
actual cumulative quantity scheduled<br />
The actual cumulative quantity scheduled in the delivery schedule message by the<br />
buyer.<br />
delivery quantity balance<br />
The difference between the cumulative quantity scheduled in the previous delivery<br />
schedule and the cumulative quantity received from the accumulation start date.<br />
For positive values, the quantity scheduled is greater than the quantity received.<br />
ENTITY : RECEIVED - DESPATCHED QUANTITIES<br />
quantity received<br />
The quantity received by the consignee.<br />
goods receipt reference<br />
Unique identification given to the receipt of goods.<br />
reception date<br />
The date/time when the goods were received by the consignee.<br />
quantity despatched<br />
The quantity despatched by the seller to the consignee.<br />
despatch advice number<br />
Unique identification number of a despatch.<br />
despatch advice date<br />
The date/time of the despatch advice message/document<br />
ENTITY : DELIVERY VARIANCE RESTRICTIONS<br />
date/time/period of the delivery variance restrictions<br />
The start date and the end date of the period, or the period valid for the delivery<br />
variance restrictions.<br />
number of working days within the referenced period<br />
Number of working days included in the referenced period ‘date/time/period’ of the<br />
delivery variance restrictions.<br />
daily average quantity within the referenced period<br />
Average quantity scheduled for each working day of the referenced period.<br />
period maximum quantity<br />
Maximum quantity which may be called-off during the referenced period.<br />
period minimum quantity<br />
Minimum quantity which may be called-off during the referenced period.<br />
Page 15