2/12/2013<br />
Project Client / Contract $ Project Description Completed<br />
Caldwell Lane Bank Stabilization US Army Corps of Engineers ® ,<br />
Fort Worth District<br />
111 W. 16th Avenue, Third Floor<br />
Anchorage, AK 99501<br />
$1.2 million<br />
North Forest Acres Levee Road City of Seward<br />
Tidal Surge Damage Shoreline<br />
Restoration and Lowell Creek Bridge<br />
Paving<br />
Levees and Bank Stabilization<br />
$1.2 million<br />
City of Seward<br />
$260,000<br />
Bethel Bank Stabilization US Army Corps of Engineers ® ,<br />
Alaska District<br />
$4.6 million<br />
<br />
Engineering, design and construction of riverbank stabilization on 1,200<br />
feet of riverbank along the Colorado River.<br />
Scope of work included:<br />
<br />
- Place riprap<br />
- Plant native vegetation along upper portions of riverbank<br />
<br />
Location: Seward, Alaska<br />
Scope of work included:<br />
- Clearing and grubbing of 10 acres<br />
<br />
<br />
to the road.<br />
Location: Seward, Alaska<br />
Restore a section of shoreline in Seward.<br />
Scope of work included:<br />
<br />
- Recover and place riprap armor rock<br />
- Repair seawall embankment<br />
- Level and grade parking lot<br />
- Remove and replace curb and gutter<br />
- Place topsoil.<br />
Location: Bethel, Alaska<br />
Stabalize bank along city dock and small boat harbor.<br />
Scope of work included:<br />
<br />
harbor<br />
<br />
seawall.<br />
(877) 563-0013<br />
www.bristol-companies.com<br />
March 2013<br />
September 2011<br />
May 2011<br />
January 2008