04.09.2013 Views

View PDF - Bristol Alliance Of Companies

View PDF - Bristol Alliance Of Companies

View PDF - Bristol Alliance Of Companies

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2/12/2013<br />

Project Client / Contract $ Project Description Completed<br />

Caldwell Lane Bank Stabilization US Army Corps of Engineers ® ,<br />

Fort Worth District<br />

111 W. 16th Avenue, Third Floor<br />

Anchorage, AK 99501<br />

$1.2 million<br />

North Forest Acres Levee Road City of Seward<br />

Tidal Surge Damage Shoreline<br />

Restoration and Lowell Creek Bridge<br />

Paving<br />

Levees and Bank Stabilization<br />

$1.2 million<br />

City of Seward<br />

$260,000<br />

Bethel Bank Stabilization US Army Corps of Engineers ® ,<br />

Alaska District<br />

$4.6 million<br />

<br />

Engineering, design and construction of riverbank stabilization on 1,200<br />

feet of riverbank along the Colorado River.<br />

Scope of work included:<br />

<br />

- Place riprap<br />

- Plant native vegetation along upper portions of riverbank<br />

<br />

Location: Seward, Alaska<br />

Scope of work included:<br />

- Clearing and grubbing of 10 acres<br />

<br />

<br />

to the road.<br />

Location: Seward, Alaska<br />

Restore a section of shoreline in Seward.<br />

Scope of work included:<br />

<br />

- Recover and place riprap armor rock<br />

- Repair seawall embankment<br />

- Level and grade parking lot<br />

- Remove and replace curb and gutter<br />

- Place topsoil.<br />

Location: Bethel, Alaska<br />

Stabalize bank along city dock and small boat harbor.<br />

Scope of work included:<br />

<br />

harbor<br />

<br />

seawall.<br />

(877) 563-0013<br />

www.bristol-companies.com<br />

March 2013<br />

September 2011<br />

May 2011<br />

January 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!