12<br />

CPIII-24 Aircraft vulnerability<br />

Covered by CPIII-14. This CP was intended as a follow-up of that. Two annual reports have<br />

been issued. (see action 2003-6)<br />

CPIII-25 Performance and IM Properties of New Explosives (UK, NL)<br />

No activity. A programme for continuation should be work out. (see action 2002-12)<br />

CPIII-26 Secondary flyers<br />

Some activity including experimental setup and velocity measurements. A meeting to discuss<br />

further plans will be held. An annual report has been issued.<br />

CPIII-27 Close Combat Modelling<br />

Bilateral UK-NL collaboration is planned as a non-ANNC programme precluding Norwegian<br />

participation. The content is very substantial. The Norwegian interest in the topic is<br />

diminishing. Termination of ANNC programme is most probable. An annual report has been<br />

issued.<br />

CPIII-28 Burster Slab Technology<br />

Related to CPIII-21. A decesion on the continuation should be made. (see action 2004-11).<br />

CPIII-29 Emerging technologies<br />

The UK contribution were presented at the meeting.<br />

6 ACTIONS ARISING FROM THIS AND PREVIOUS ANNUAL MEETINGS<br />

A list of action was set up during the meeting as a result of a the review process. The following<br />

list contains all the original item with 5 additional actions encounters through a post-meeting<br />

review. Actions arising from 2003 or earlier being left out of the present list should be<br />

considered as completed, deleted or overtaken by other actions.<br />

Names written with a bold font should indentfy the person having the main responsibility for<br />

the action.<br />

No. CPIII- Issue Time<br />

due<br />

Responsible<br />

2001-35 Provide information on Health Usage<br />

Monitoring System (HUMS)<br />

12/04 Dave Tucker<br />

2002-12 25 POC to rewrite programme to reflect 04/05 Richard Bouma<br />

current levels of interest<br />

Nat. leaders<br />

2003-3 12 Consider a follow-up programme for 12/04 Ton Verhoeven<br />

AFV Mine Protection<br />

Ian Pickup<br />

Ove Dullum<br />

2003-5 15 Write and release reports on CPIII-14 Air Pat Collins<br />

Target Vulnerability<br />

Peter Doup<br />

2003-6 15 Write a programme proposal for TOR for Pat Collins<br />

CPIII-24 Aircraft Vulnerability<br />

Peter Doup