24<br />
D.3 ANNUAL REPORT OF A/NL/N CPIII-17<br />
a. Project title and identity<br />
Protective Structures<br />
2001-3 UK/Aus 27te trial Sept. 2002 (UK/Aus Defence Trial 840)<br />
2001-3 UK/Aus 5te trial Sept. 2002 (UK/Aus Defence Trial 840)<br />
2001-19 UK/Aus 5te trials May 2004 (UK/Aus Defence Trial 845)<br />
b. Chief liaison persons<br />
UK: Maj R P Sheldon RE Dstl Farnborough<br />
Tel: +44 (1252) 374061<br />
Fax: +44 (1252) 374227<br />
E-Mail: rpsheldon@dstl.gov.uk<br />
UK: Mr. CA Hoing DOSG Bristol<br />
Email: DOSGST5b@dpa.mod.uk<br />
NL: Philip Van Dongen TNO-PML<br />
Tel: +31 (15) 284 3396<br />
Fax: +31 (15) 284 3954<br />
E-Mail: dongen@pml.tno.nl<br />
NO: Helge Langberg Norwegian Defence Estates Agency<br />
Tel: +47 23 09 39 88<br />
Fax: +47 23 09 3447 or 3176<br />
E-Mail: helge.langberg@forsvarsbygg.no<br />
c. Reports exchanged Final trial layouts have been exchanged and discussed.<br />
d. Meetings and visits Various meetings with 5 ton trials participants (including<br />
UK and NL) in Woomera, SA, in the period that both trials were conducted (May<br />
2004).<br />
e. Progress/description of activities. UK/Aus Defence Trial 840 (27te and 5te<br />
trials, 2002) were succesfully conducted. Scientific reports with trials results were<br />
finished for three assignors:<br />
TNO report entitled “Measurement setup and results of the 27 tonne explosion test”<br />
for UK/MoD/DOSG (POC: Mr. C.A. Hoing).<br />
TNO report entitled “5 tonne explosion trial, Pressure measurements inside trenches”<br />
for DSTL (POC maj. R.P. Sheldon).<br />
TNO-reports “Safe field storage of ammunition and explosives” for NL/MoD (POC Kol.<br />
A.P. Coppens).