D.1 ANNUAL REPORT OF ANNC CPIII-5b<br />
a. CPIII-5b Mechanical Ageing of Rocket Propellants<br />
b. Chief Liaison Personnel<br />
UK: Mr Dave Tucker (Dstl Fort Halstead)<br />
Dr Dave Tod (QinetiQ, Fort Halstead)<br />
NL: Mr Huub Keizers (TNO-PML)<br />
Mr. Gerhard Reeling Brouwer (TNO-PML)<br />
NO: Mr Greger Johansen<br />
c. Reports exchanged<br />
None<br />
d. Meetings/Visits<br />
No formal meetings have taken place in the last year. Discussions on possible (active)<br />
continuation of previous cumulative damage work has been held in the sideline of<br />
other joint NATO activities (AVT-119).<br />
e. Progress/description of activities<br />
NL activity (TNO-PML)<br />
A significant amount of work has been performed on the ageing of solid propellant<br />
rocket motors, using motor analogues. Activities include chemical and mechanical<br />
ageing modelling, sensors, specialised testing techniques, etc. Results of this work<br />
has been discussed with Mr. D. Tucker (DSTL) and Mr. J. Theobold (QinetiQ).<br />
Furthermore work on crack-testing under motor conditions (pressurised) have been<br />
addressed.<br />
f. Future activities<br />
TNO and QinetiQ would like to set-up a joint effort (possibly including Norway), in the<br />
field of life assessment of rocket motors, focussing on cumulative damage of solid<br />
propellant rocket motors. Details and funding are tbd (see item g).<br />
g. Matters of note<br />
Due to personal circumstances the planned meeting on the way-forward has been<br />
delayed a number of times, but both parties still consider this topic very worthwhile<br />
(modelling of cumulative damage and crack growth / crack prediction) for further joint<br />
activities. A meeting is planned for the end of this year to try to define a programme of<br />
work.<br />
The final report of the foregoing activity is waiting for the planned meeting<br />
(Keizers/Tod) to occur.