Conveyance and End-of-Pipe Measures for Stormwater - FCM
Conveyance and End-of-Pipe Measures for Stormwater - FCM
Conveyance and End-of-Pipe Measures for Stormwater - FCM
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Figure A–17: Cutaway <strong>of</strong> a Swirl Concentrator ®<br />
■ United States Navy, Naval Facilities<br />
Engineering Service Center, Environmental<br />
Services, nd. Web site . Accessed November 26, 2004.<br />
■ Wood, J., M. Yang, Q. Roch<strong>for</strong>t, P. Chessie,<br />
J. Marsalek, <strong>and</strong> P. Seto, 2004. “Feasibility<br />
<strong>of</strong> <strong>Stormwater</strong> Treatment by Conventional<br />
<strong>and</strong> Lamellar Settling with <strong>and</strong> without<br />
Polymeric Flocculant Addition.” Pages<br />
227–234 <strong>of</strong> Proceedings NOVATECH 2004,<br />
June 6–10, Lyon, France.<br />
Figure A–18: Dunkers flow balancing<br />
system schematic<br />
A.2.8 Storage in Receiving Waters<br />
by Displacement<br />
Reference<br />
■ Aqua<strong>for</strong> Beech Limited, 1994. Environmental<br />
Study Report, Brimley Road Drainage Area<br />
– Water Quality Enhancement Strategy, Final<br />
Report. Prepared <strong>for</strong> the City <strong>of</strong> Scarborough.<br />
A.2.9 Screening<br />
References<br />
■ MacViro Consultants Limited <strong>and</strong> Gore<br />
& Storrie Limited, 1991. Sewer System<br />
Master Plan. Prepared <strong>for</strong> City <strong>of</strong> Toronto.<br />
■ Pran, D.H. <strong>and</strong> P.L. Brunner, 1979. US<br />
Environmental Protection Agency August<br />
Publication: “Combined Sewer Overflow<br />
Treatment by Screening <strong>and</strong> Terminal<br />
Ponding.” EPA–600/2–29–085, Fort Wayne,<br />
Indiana.<br />
Figure A–19: Screening to remove<br />
floatable material from<br />
combined sewer overflow<br />
<strong>Conveyance</strong> <strong>and</strong> <strong>End</strong>-<strong>of</strong>-<strong>Pipe</strong> <strong>Measures</strong> <strong>for</strong> <strong>Stormwater</strong> Control — July 2005 51<br />
A. <strong>Stormwater</strong> Best<br />
Management<br />
Practice Facilities<br />
A.2 <strong>End</strong>-<strong>of</strong>-<strong>Pipe</strong> Control<br />
Best Management<br />
Practices<br />
Figure A–17<br />
Cutaway <strong>of</strong> a Swirl<br />
Concentrator<br />
Figure A–18<br />
Dunkers flow balancing<br />
system schematic<br />
Figure A–19<br />
Screening to remove<br />
floatable material from<br />
combined sewer overflow