11.10.2013 Views

Conveyance and End-of-Pipe Measures for Stormwater - FCM

Conveyance and End-of-Pipe Measures for Stormwater - FCM

Conveyance and End-of-Pipe Measures for Stormwater - FCM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure A–17: Cutaway <strong>of</strong> a Swirl Concentrator ®<br />

■ United States Navy, Naval Facilities<br />

Engineering Service Center, Environmental<br />

Services, nd. Web site . Accessed November 26, 2004.<br />

■ Wood, J., M. Yang, Q. Roch<strong>for</strong>t, P. Chessie,<br />

J. Marsalek, <strong>and</strong> P. Seto, 2004. “Feasibility<br />

<strong>of</strong> <strong>Stormwater</strong> Treatment by Conventional<br />

<strong>and</strong> Lamellar Settling with <strong>and</strong> without<br />

Polymeric Flocculant Addition.” Pages<br />

227–234 <strong>of</strong> Proceedings NOVATECH 2004,<br />

June 6–10, Lyon, France.<br />

Figure A–18: Dunkers flow balancing<br />

system schematic<br />

A.2.8 Storage in Receiving Waters<br />

by Displacement<br />

Reference<br />

■ Aqua<strong>for</strong> Beech Limited, 1994. Environmental<br />

Study Report, Brimley Road Drainage Area<br />

– Water Quality Enhancement Strategy, Final<br />

Report. Prepared <strong>for</strong> the City <strong>of</strong> Scarborough.<br />

A.2.9 Screening<br />

References<br />

■ MacViro Consultants Limited <strong>and</strong> Gore<br />

& Storrie Limited, 1991. Sewer System<br />

Master Plan. Prepared <strong>for</strong> City <strong>of</strong> Toronto.<br />

■ Pran, D.H. <strong>and</strong> P.L. Brunner, 1979. US<br />

Environmental Protection Agency August<br />

Publication: “Combined Sewer Overflow<br />

Treatment by Screening <strong>and</strong> Terminal<br />

Ponding.” EPA–600/2–29–085, Fort Wayne,<br />

Indiana.<br />

Figure A–19: Screening to remove<br />

floatable material from<br />

combined sewer overflow<br />

<strong>Conveyance</strong> <strong>and</strong> <strong>End</strong>-<strong>of</strong>-<strong>Pipe</strong> <strong>Measures</strong> <strong>for</strong> <strong>Stormwater</strong> Control — July 2005 51<br />

A. <strong>Stormwater</strong> Best<br />

Management<br />

Practice Facilities<br />

A.2 <strong>End</strong>-<strong>of</strong>-<strong>Pipe</strong> Control<br />

Best Management<br />

Practices<br />

Figure A–17<br />

Cutaway <strong>of</strong> a Swirl<br />

Concentrator<br />

Figure A–18<br />

Dunkers flow balancing<br />

system schematic<br />

Figure A–19<br />

Screening to remove<br />

floatable material from<br />

combined sewer overflow

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!