Conveyance and End-of-Pipe Measures for Stormwater - FCM
Conveyance and End-of-Pipe Measures for Stormwater - FCM
Conveyance and End-of-Pipe Measures for Stormwater - FCM
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
B.2 Design Example: Development <strong>of</strong> a 10 Ha <strong>of</strong> L<strong>and</strong> <strong>for</strong> Single Family Homes<br />
(Vegetated Swale)<br />
Figure B–2: Example <strong>of</strong> a selected vegetated<br />
swale design<br />
<strong>Conveyance</strong> <strong>and</strong> <strong>End</strong>-<strong>of</strong>-<strong>Pipe</strong> <strong>Measures</strong> <strong>for</strong> <strong>Stormwater</strong> Control — July 2005 55<br />
B. Design Examples<br />
B.2 Design Example:<br />
Development <strong>of</strong> a<br />
10 Ha <strong>of</strong> L<strong>and</strong> <strong>for</strong><br />
Single Family Homes<br />
(Vegetated Swale)<br />
Figure B–2<br />
Example <strong>of</strong> a selected<br />
vegetated swale design