11.10.2013 Views

Conveyance and End-of-Pipe Measures for Stormwater - FCM

Conveyance and End-of-Pipe Measures for Stormwater - FCM

Conveyance and End-of-Pipe Measures for Stormwater - FCM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix B:<br />

Design Examples<br />

B.1 Design Example: Daylighting Thain Creek (Culvert Replacement/Riparian<br />

Corridor Enhancement)<br />

Figure B–1: Culvert replacement, be<strong>for</strong>e <strong>and</strong> after<br />

Be<strong>for</strong>e After<br />

<strong>Conveyance</strong> <strong>and</strong> <strong>End</strong>-<strong>of</strong>-<strong>Pipe</strong> <strong>Measures</strong> <strong>for</strong> <strong>Stormwater</strong> Control — July 2005 53<br />

B. Design Examples<br />

B.1 Design Example:<br />

Daylighting Thain<br />

Creek (Culvert<br />

Replacement/<br />

Riparian Corridor<br />

Enhancement)<br />

Figure B–1<br />

Culvert replacement, be<strong>for</strong>e<br />

<strong>and</strong> after

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!