Task 17 <strong>Evacuation</strong> D17-1<br />
Contract No:GOCE-CT-2004-505420<br />
1.3 Definition of evacuation<br />
<strong>Evacuation</strong> is a response to the immediate or forecast threat of flooding that is expected to pose a risk<br />
to life, health or well-being. It involves people moving from their houses or places of business to<br />
‘safe’ locations, out of the flood risk area where they are able to shelter until it is possible <strong>and</strong><br />
appropriate for them to return. Figure 1.2 shows how the eight main stages in evacuation planning <strong>and</strong><br />
how they are related to the preparation <strong>and</strong> response phases of the disaster risk <strong>management</strong> cycle.<br />
After<br />
the<br />
event<br />
Figure 1.2 The stages of evacuation related to the preparation <strong>and</strong> response phases of the disaster<br />
risk <strong>management</strong> cycle<br />
1.4 Stages in evacuation planning<br />
In evacuation planning eight main stages can be identified. These are detailed below.<br />
1. Stakeholder involvement<br />
Before the actual start of the planning takes place it is important to recognise who should be involved<br />
in the planning process. Research has demonstrated a huge added value of involving appropriate<br />
stakeholders since they bring with them an amount of experience <strong>and</strong> knowledge that might be useful<br />
for planning an organisation (Atkinson et al, 2006).<br />
2. Design of the plan<br />
Actual evacuation<br />
<strong>Evacuation</strong> <strong>Evacuation</strong><br />
Preparation/packing<br />
Preparation/packing<br />
Decision Decision<br />
Assessment<br />
Assessment<br />
Recovery Recovery<br />
Response Response<br />
Recognition<br />
Recognition<br />
EVENT<br />
EVENT<br />
Prevention Prevention<br />
&&<br />
Mitigation Mitigation<br />
Preparation<br />
Preparation<br />
<strong>Evacuation</strong> planning<br />
Raising Raising awareness awareness<br />
Stakeholder Stakeholder involvement<br />
involvement<br />
Plan Plan design design<br />
Before<br />
the<br />
event<br />
T17_07_02_<strong>Evacuation</strong>_<strong>and</strong>_<strong>traffic</strong>_<strong>management</strong>_D17_1_V4_4_P01.doc 19 03 2008<br />
4