18.10.2013 Views

Evacuation and traffic management (full report) - FLOODsite

Evacuation and traffic management (full report) - FLOODsite

Evacuation and traffic management (full report) - FLOODsite

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Task 17 <strong>Evacuation</strong> D17-1<br />

Contract No:GOCE-CT-2004-505420<br />

DOCUMENT INFORMATION<br />

Title <strong>Evacuation</strong> <strong>and</strong> <strong>traffic</strong> <strong>management</strong><br />

Lead Authors<br />

Darren Lumbroso, Eric Gaume, Christiaan Logtmeijer, Marjolein<br />

Mens, Marnix van der Vat<br />

Contributors<br />

Peter Bakonyi, Alfred Olfert, Pierre-Antoine Versini, Bridget Woods-<br />

Ballard<br />

Distribution Public<br />

Document Reference T17-07-02<br />

DOCUMENT HISTORY<br />

Date Revision Prepared by Organisation Approved by Notes<br />

12/10/2007 1_0_P01 Darren<br />

Lumbroso<br />

HR Wallingford Initial draft<br />

30/11/2007 2_0_P01 Darren<br />

Lumbroso<br />

12/12/2007 3_0_P01 Darren<br />

Lumbroso<br />

20/12/2007 3_1_P01 Darren<br />

Lumbroso<br />

04/03/2008 4_0_P01 Darren<br />

Lumbroso<br />

06/03/2008 4_1_P01 Darren<br />

Lumbroso<br />

HR Wallingford Second draft following comments<br />

meeting in November in Paris<br />

HR Wallingford Third draft prepared after receiving<br />

further contributions<br />

HR Wallingford Further minor revisions following<br />

receipt of additional text <strong>and</strong><br />

HR Wallingford<br />

comments<br />

Fourth draft incorporating comments<br />

made by the <strong>FLOODsite</strong> review in<br />

February<br />

HR Wallingford Further minor revisions to version 4.0<br />

17/03/2008 4_2_P01 Frans Klijn WL Delft Hydraulics Further minor revisions to version 4.1<br />

19/03/2008 4_3_P01 Darren<br />

Lumbroso<br />

HR Wallingford Minor revisions to version 4.2<br />

07/04/08 4_4_P01 Paul Samuels HR Wallingford Final formatting<br />

ACKNOWLEDGEMENT<br />

The work described in this publication was supported by the European Community’s Sixth Framework<br />

Programme through the grant to the budget of the Integrated Project <strong>FLOODsite</strong>, Contract GOCE-CT-<br />

2004-505420.<br />

DISCLAIMER<br />

This document reflects only the authors’ views <strong>and</strong> not those of the European Community. This work<br />

may rely on data from sources external to the <strong>FLOODsite</strong> project Consortium. Members of the<br />

Consortium do not accept liability for loss or damage suffered by any third party as a result of errors<br />

or inaccuracies in such data. The information in this document is provided “as is” <strong>and</strong> no guarantee or<br />

warranty is given that the information is fit for any particular purpose. The user thereof uses the<br />

information at its sole risk <strong>and</strong> neither the European Community nor any member of the <strong>FLOODsite</strong><br />

Consortium is liable for any use that may be made of the information.<br />

© <strong>FLOODsite</strong> Consortium<br />

T17_07_02_<strong>Evacuation</strong>_<strong>and</strong>_<strong>traffic</strong>_<strong>management</strong>_D17_1_V4_4_P01.doc 19 03 2008<br />

ii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!