Table 3 – Local Road Implementation (PSP)
Table 3 – Local Road Implementation (PSP)
Table 3 – Local Road Implementation (PSP)
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Table</strong> 3 - <strong>Local</strong> <strong>Road</strong> <strong>Implementation</strong><br />
<strong>Implementation</strong><br />
Area ID<br />
Length of <strong>Road</strong> to<br />
be Constructed<br />
<strong>Road</strong> Infrastructure<br />
Project Name<br />
1A CR01 Hillview <strong>Road</strong> West<br />
2A CR02 Hillview <strong>Road</strong> East<br />
1B CR03 Brendan <strong>Road</strong> South<br />
2B CR04 Brendan <strong>Road</strong> North<br />
1C CR05 French <strong>Road</strong> South<br />
2C CR06 French <strong>Road</strong> North<br />
1D CR07 Section <strong>Road</strong> North<br />
2D CR08 Section <strong>Road</strong> Central<br />
<strong>Road</strong> Infrastructure<br />
Project Description<br />
Hillview <strong>Road</strong>: Mickleham<br />
<strong>Road</strong> to French <strong>Road</strong> and<br />
associated roundabout<br />
Hillview <strong>Road</strong>: French <strong>Road</strong><br />
to Brendan <strong>Road</strong><br />
Applicable <strong>Road</strong> Cross<br />
Section<br />
20m Interim Connector<br />
<strong>Road</strong> (<strong>PSP</strong> Figure 2); 25m<br />
Ultimate Connector <strong>Road</strong><br />
(<strong>PSP</strong> Figure 3)<br />
20m Interim Connector<br />
<strong>Road</strong> (<strong>PSP</strong> Figure 2); 25m<br />
Ultimate Connector <strong>Road</strong><br />
(<strong>PSP</strong> Figure 3)<br />
Brendan <strong>Road</strong>: East-West 20m Interim Connector<br />
Connector <strong>Road</strong> 1 (refer <strong>Road</strong> (<strong>PSP</strong> Figure 2); 25m<br />
Greenvale Central DCP item Ultimate Connector <strong>Road</strong><br />
RD01) to Somerton <strong>Road</strong> (<strong>PSP</strong> Figure 3)<br />
Brendan <strong>Road</strong>: Hillview<br />
20m Interim Connector<br />
<strong>Road</strong> to East-West<br />
<strong>Road</strong> (<strong>PSP</strong> Figure 2); 25m<br />
Connector <strong>Road</strong> 1 (refer<br />
Ultimate Connector <strong>Road</strong><br />
Greenvale Central DCP item<br />
(<strong>PSP</strong> Figure 3)<br />
RD01)<br />
French <strong>Road</strong>: Somerton<br />
<strong>Road</strong> to Passive Open Space<br />
2 (refer <strong>Table</strong> 2: Open 20m Access Street Level 2<br />
Space Inventory) and (<strong>PSP</strong> Figure 5)<br />
associated left in, left out<br />
access works<br />
French <strong>Road</strong>: Hillview <strong>Road</strong><br />
to East-West Connector<br />
<strong>Road</strong> 1 (refer Greenvale<br />
Central DCP item RD01)<br />
Section <strong>Road</strong>: Somerton<br />
<strong>Road</strong> to southern boundary<br />
of Property 6 (refer Plan 4:<br />
Land Use Budget)<br />
20m Interim Connector<br />
<strong>Road</strong> (<strong>PSP</strong> Figure 2); 25m<br />
Ultimate Connector <strong>Road</strong><br />
(<strong>PSP</strong> Figure 3)<br />
Reserve Connector <strong>Road</strong><br />
(<strong>PSP</strong> Figure 7)<br />
Section <strong>Road</strong>: Northern<br />
boundary of Property 7<br />
(refer Plan 4: Land Use<br />
Reserve Connector <strong>Road</strong><br />
Budget) to East-West<br />
(<strong>PSP</strong> Figure 7)<br />
Connector <strong>Road</strong> 2 (refer<br />
Greenvale Central DCP item<br />
RD02)<br />
<strong>Implementation</strong> Area<br />
Titles (refer Property<br />
Specific Land Budget)<br />
77-78, 83, 92 -<br />
<strong>Implementation</strong> Area/s to<br />
be completed or included<br />
prior to commencement<br />
79-82, 93, 104 1A, or both 1B and 2B<br />
100-101, 107-108 -<br />
102-103, 105-106 1B, or both 1A and 2A<br />
<strong>Road</strong> changes<br />
Interim and ultimate<br />
cross-sections altered Nil<br />
Interim and ultimate<br />
cross-sections altered Nil<br />
Affected property<br />
changes<br />
Interim and ultimate<br />
Removed: 99, 109<br />
cross-sections altered<br />
Interim and ultimate<br />
cross-sections altered Nil<br />
88-89, 96-97 - Nil Removed: 86-87, 98<br />
90-91, 94-95 1C or 1A<br />
1-7, 11-15 -<br />
8, 16-18 1D<br />
Interim and ultimate<br />
Removed: 84-85<br />
cross-sections altered<br />
Shared path<br />
incorporated into<br />
Greenvale Recreation<br />
Reserve<br />
Shared path<br />
incorporated into<br />
Removed: 9-10<br />
Greenvale Recreation<br />
Reserve
<strong>Implementation</strong><br />
Area ID<br />
Length of <strong>Road</strong> to<br />
be Constructed<br />
<strong>Road</strong> Infrastructure<br />
Project Name<br />
3D CR09 Section <strong>Road</strong> South<br />
1E CR10 Bonds Lane North<br />
2E CR11 Bonds Lane South<br />
1F CR12 Providence <strong>Road</strong> East<br />
2Fa CR13 Providence <strong>Road</strong> West<br />
2Fb CR14 Carroll Lane<br />
2G CR15 Bonds Lane East<br />
CHANGES<br />
<strong>Road</strong> Infrastructure<br />
Project Description<br />
Applicable <strong>Road</strong> Cross<br />
Section<br />
Section <strong>Road</strong>: East-West<br />
Connector <strong>Road</strong> 2 (refer 20m Access Street 2 (<strong>PSP</strong><br />
Greenvale Central DCP item Figure 5)<br />
RD02) to Providence <strong>Road</strong><br />
Bonds Lane: Somerton <strong>Road</strong><br />
to southern boundary of<br />
Property 38 (refer Plan 4:<br />
Land Use Budget) and<br />
associated left in/left out<br />
access works<br />
Bonds Lane: Northern<br />
boundary of Property 39<br />
(refer Plan 4: Land Use<br />
Budget) to East-West<br />
Connector 3 (refer DCP)<br />
Providence <strong>Road</strong>: Carroll<br />
Lane to Mickleham <strong>Road</strong><br />
Providence <strong>Road</strong>: Section<br />
<strong>Road</strong> to Carroll Lane<br />
Carroll Lane: Bonds Lane<br />
Extension (Greenvale<br />
Central refer DCP item<br />
RD04) to Providence <strong>Road</strong><br />
Bonds Lane: Bonds Lane<br />
Extension (Greenvale<br />
Central refer DCP item<br />
RD04)) to Mickleham <strong>Road</strong><br />
20m Access Street Level 2<br />
(<strong>PSP</strong> Figure 5)<br />
20m Access Street Level 2<br />
(<strong>PSP</strong> Figure 5)<br />
20m Interim Connector<br />
<strong>Road</strong> (<strong>PSP</strong> Figure 2); 25m<br />
Ultimate Connector <strong>Road</strong><br />
(<strong>PSP</strong> Figure 3)<br />
20m Access Street Level 2<br />
(<strong>PSP</strong> Figure 5)<br />
20m Interim Connector<br />
<strong>Road</strong> (<strong>PSP</strong> Figure 2); 25m<br />
Ultimate Connector <strong>Road</strong><br />
(<strong>PSP</strong> Figure 3)<br />
20m Access Street 2 (<strong>PSP</strong><br />
Figure 5)<br />
<strong>Implementation</strong> Area<br />
Titles (refer Property<br />
Specific Land Budget)<br />
19-24<br />
<strong>Implementation</strong> Area/s to<br />
be completed or included<br />
prior to commencement<br />
1D and 2D, or 1F and 2F, or<br />
RD02 and RD03 (refer<br />
Greenvale Central DCP)<br />
<strong>Road</strong> changes<br />
Shared path<br />
incorporated into<br />
Nil<br />
Greenvale Recreation<br />
Reserve<br />
Affected property<br />
changes<br />
35, 38 - Nil Removed: 36-37, 50<br />
39-41 1E Nil Removed: 42, 46-49<br />
30, 61 -<br />
25-32, 62-64 1F<br />
54-56, 59-60 1F<br />
43-45, 51-53 -<br />
Interim and ultimate Altered: 30<br />
cross-sections altered Removed: 60, 65-67<br />
Downgraded to<br />
Access Street Level 2<br />
Altered: 30<br />
Removed: 31-32, 62-<br />
64<br />
Interim and ultimate Altered: 43-45, 51-53<br />
cross-sections altered Removed: 57-58<br />
Downgraded to<br />
Access Street Level 2<br />
Altered: 43-45, 51-53