Asbestos SurveyReport - Former Fort Ord - Environmental Cleanup
Asbestos SurveyReport - Former Fort Ord - Environmental Cleanup
Asbestos SurveyReport - Former Fort Ord - Environmental Cleanup
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
\,<br />
●<br />
* w<br />
v<br />
c.“.!’!,<br />
‘:’’’”$ !<br />
1<br />
.J<br />
V(<br />
I<br />
.~nr<br />
ASBESTOS SURVEY REPORT<br />
CORPS OF ENGINEERS -<br />
FORT ORD lNSTALLAmON<br />
ASBESTOS SURVEY REPORT<br />
U.S. ARMY CORPS OF ENGINEERS - FORT ORD INSTALLATION<br />
FORT ORD, CALIFORNIA<br />
EXEC~lVE SUMMARY<br />
INTRODUCTION<br />
PROJECT DISCUSSION<br />
TABLE OF CONTENTS<br />
vOLUME 1<br />
FINDINGS, RECOMMENDATIONS AND COST ESTIMATES<br />
TABLE 1A - STRUCTURESMATERIALS WITH RATINGS OF 1 TO 5<br />
TABLE 1B - HVAC FLEXIBLE CONNECTORS IN GOOD CONDITION<br />
WITH RATINGS OF 1 AND 2<br />
TABLE 2- STRUCTURES IN WHICH NO ASBESTOS WAS DETECTED<br />
TABLE 3- FINANCIAL IMPACT BY MATERIAL<br />
TABLE 4- CURRENT WORKING ESTIMATE (CWE) SUMMARY<br />
TABLE 5- LOCATIONS OF DOL AND DEI NUMBERED STRUCTURES<br />
BUILDING INFORMATION<br />
DEFINITIONS<br />
SITE PIANS<br />
APPENDIX – QUALl~ CONTROL SAMPLE LOG<br />
BUILDING INFORMATION (CONTINUED)<br />
VOLUMES 2-66<br />
BUILDING SUMMARY AND WORK ITEMS, PLANS, SAMPLE LOGS,<br />
AND COST ESTIMATES<br />
VOLUME 2- BUILDINGS<br />
m<br />
MGate Main Gate Sent~ Station<br />
JO1 I<br />
701 ~<br />
SLOOOO1<br />
TOOO05<br />
Airfield Operations Building<br />
General Storehouse<br />
w<br />
JQ<br />
LJSA~F<br />
‘ TOOO06<br />
TOOO07<br />
Clinic WNhout Beds<br />
Administration General P<br />
700008 Vacant (Formedy Storag{<br />
Ic