20.12.2013 Views

Green Infrastructure to Combat Climate Change: A Framework for ...

Green Infrastructure to Combat Climate Change: A Framework for ...

Green Infrastructure to Combat Climate Change: A Framework for ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5. Actions <strong>for</strong> managing riverine<br />

flooding<br />

P D N Partner Mechanism Service<br />

a. Where possible, use land in areas at<br />

risk of flooding (see Map 5 or local data)<br />

as open space and make provision <strong>for</strong><br />

temporary water s<strong>to</strong>rage within it. Use<br />

the sequential test of Planning Policy<br />

Statement 25 <strong>to</strong> decide on the most<br />

appropriate land uses in flood risk<br />

areas, along with flood sensitive design.<br />

Local Authorities<br />

Environment<br />

Agency<br />

Land Owners<br />

and Managers<br />

Developers<br />

Local Development <strong>Framework</strong>s<br />

Neighbourhood, Parish and Town<br />

Plans<br />

Strategic Flood Risk Assessments<br />

Catchment Flood Management Plans<br />

Masterplans<br />

Ecological Networks and Res<strong>to</strong>ration<br />

Zones<br />

Temps<br />

Travel<br />

Species<br />

Coastal<br />

flood<br />

Integrated Biodiversity Delivery Areas<br />

NW River Basin Management Plan<br />

b. Encourage appropriate land use and<br />

management, including agricultural<br />

practices, in the upper catchments of<br />

rivers <strong>to</strong> reduce flood risk (Map 5 or<br />

local data) and impacts of spate flows,<br />

reduce soil erosion (Map 10 or local<br />

data) and maintain base flows <strong>to</strong> rivers.<br />

This will include intercepting, holding,<br />

and infiltrating water upstream through<br />

peatland res<strong>to</strong>ration, wetland creation,<br />

tree and woodland creation (targeted<br />

<strong>to</strong> buffers around riverbanks and<br />

floodplains, bare and eroding mineral<br />

soils, and field margins), and use of<br />

techniques such as willow spilling,<br />

where appropriate (Case Studies 7,<br />

8 and 17). Continued moni<strong>to</strong>ring<br />

of programmes <strong>to</strong> determine their<br />

effectiveness. This will require<br />

significant cross-boundary working<br />

and consultation with the Environment<br />

Agency <strong>to</strong> ensure that natural river<br />

processes are not impacted and activity<br />

helps <strong>to</strong> achieve Good Ecological Status<br />

under the Water <strong>Framework</strong> Directive.<br />

Potentially develop mechanisms<br />

<strong>to</strong> financially link downstream<br />

development with upstream flood<br />

management activities, including land<br />

acquisition where desirable.<br />

Environment<br />

Agency<br />

Forestry<br />

Commission<br />

Woodland<br />

Initiatives<br />

Local Authorities<br />

Land Owners<br />

and Managers<br />

Woodland Trust<br />

Natural England<br />

United Utilities<br />

National Parks<br />

Authorities<br />

Landscape<br />

Partnerships<br />

AONBs<br />

Farmers<br />

FWAG<br />

National Farmers’<br />

Union<br />

Woodland<br />

Initiatives<br />

BTCV<br />

Catchment Flood Management Plans<br />

Local Biodiversity Action Plans<br />

Local Development <strong>Framework</strong>s<br />

CIL, S106, Planning Conditions<br />

Neighbourhood, Parish and Town<br />

Plans<br />

Environmental Stewardship and EWGS<br />

Catchment Sensitive Farming<br />

Ecological Networks and Res<strong>to</strong>ration<br />

Zones<br />

Integrated Biodiversity Delivery Areas<br />

Sub-Regional GI <strong>Framework</strong>s<br />

NW River Basin Management Plan<br />

SCaMP<br />

Management Plans<br />

Peatland Projects<br />

MOREwoods<br />

Single Payment Scheme<br />

Big Tree Plant<br />

Surface<br />

water<br />

Carbon<br />

Food<br />

Species<br />

Erosion<br />

Water<br />

resources<br />

c. Identify and prioritise river stretches<br />

<strong>for</strong> rehabilitation and res<strong>to</strong>ration<br />

(e.g. reconnecting rivers <strong>to</strong> their<br />

floodplains). Take opportunities <strong>to</strong><br />

de-culvert and re-naturalise rivers<br />

<strong>to</strong> provide space <strong>for</strong> water as well as<br />

wildlife, including floodplain <strong>for</strong>estry,<br />

wet meadows, and saltmarsh (Case<br />

Studies 9 and 19).<br />

Environment<br />

Agency<br />

Forestry<br />

Commission<br />

Developers<br />

Local Authorities<br />

Woodland<br />

Initiatives<br />

Local Development <strong>Framework</strong>s<br />

Neighbourhood, Parish and Town<br />

Plans<br />

Ecological Networks and Res<strong>to</strong>ration<br />

Zones<br />

Integrated Biodiversity Delivery Areas<br />

Environmental Stewardship and EWGS<br />

Water <strong>Framework</strong> Directive<br />

Species<br />

Water<br />

resources<br />

NW River Basin Management Plan<br />

Also see actions 1a-j, 2a-e, 3d, 4a-b, 6b, 7a, 9b, 10a-b, 12a, and 13b which deliver this service.<br />

33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!