30.12.2013 Views

Process Guidance Note 6/34(11) - Defra

Process Guidance Note 6/34(11) - Defra

Process Guidance Note 6/34(11) - Defra

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Permit reviews<br />

2.7 Under LAPPC, the legislation requires permits to be reviewed periodically but does<br />

not specify a frequency. It is considered for this sector that a frequency of once<br />

every eight years ought normally to be sufficient for the purposes of the appropriate<br />

Regulations. Further guidance on permit reviews is contained in the appropriate<br />

<strong>Guidance</strong> Manual for England and Wales, Scotland, Practical guide section 10 and<br />

Northern Ireland Part B <strong>Guidance</strong> page 9, Northern Ireland Part C <strong>Guidance</strong><br />

chapter 17. Regulators should use any opportunities to determine the variations to<br />

permits necessitated by paragraph 2.2 above in conjunction with these reviews.<br />

2.8 Conditions should also be reviewed where complaint is attributable to the operation<br />

of the process and is, in the opinion of the regulator, justified.<br />

PG6/<strong>34</strong>(<strong>11</strong>) 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!