30.12.2013 Views

Process Guidance Note 6/34(11) - Defra

Process Guidance Note 6/34(11) - Defra

Process Guidance Note 6/34(11) - Defra

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix 2: Model Permit<br />

[ ] COUNCIL<br />

POLLUTION PREVENTION AND CONTROL ACT 1999<br />

Environmental Permitting Regulations 2010 (as amended)<br />

Permit ref. no:<br />

Installation Details (i) Name and address of operator: + (if appropriate) registered<br />

number and office of company.<br />

(ii) Address of permitted installation: [outlined on attached plan; + include location of<br />

spray booth(s), areas for storage of organic solvent containing materials and wastes).<br />

The above named company is permitted to operate a vehicle refinishing installation<br />

subject to compliance with the following conditions:<br />

PG6/<strong>34</strong>(<strong>11</strong>) 42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!