Phase 1 Environmental Site Assessment<br />

Old Panola Mills Building<br />

Batesville, MS<br />

9.0 CONCLUSIONS<br />

We have performed a Phase I Environmental Site Assessment in general conformance with the<br />

scope and limitations of ASTM Practice E 1527-05 and 40 CFR 312 “All Appropriate Inquiry”<br />

of the proposed razed-portion of the Old Panola Mills Building located at 137 Van Voris Street,<br />

Batesville, Mississippi. Any exceptions to, or deletions from, this practice are described in<br />

Section 11.0 of this report. This assessment has revealed no apparent evidence of recognized<br />

environmental conditions in connection with the property.<br />

10.0 DATA GAPS<br />

Reasonably ascertainable historical documentation at five-year intervals back to first<br />

development was not available. It is our opinion that this data gap did not affect our ability to<br />

identify recognized environmental conditions in connection with the property.<br />

11.0 DEVIATIONS<br />

There were no deviations from the referenced practice.<br />

________________________________________________________________________________________________________<br />

Neel-Schaffer, Inc. Page 9<br />

Project No. NS.7705.001

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!