the tenderer - Gujarat Electricity Board
the tenderer - Gujarat Electricity Board
the tenderer - Gujarat Electricity Board
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Page 30 of 30<br />
• All standard terms and conditions prescribed by <strong>the</strong> corporation for <strong>the</strong> work order<br />
shall be applicable to <strong>the</strong> contractor.<br />
• Any scrap/defective components derived from <strong>the</strong> repairs/replacement of <strong>the</strong> RO<br />
Systems parts may be credited to GSECL sub store / Main Store as per <strong>the</strong><br />
instruction of EIC.<br />
• Contractor should ensure that only qualified persons are deputed for attending <strong>the</strong><br />
works. GSECL shall not be responsible for any accident (fatal or non-fatal), legal<br />
complication or liabilities <strong>the</strong>re of.<br />
• Contractor has to take all necessary precaution so that no damage to <strong>the</strong> GSECL<br />
property takes place. GSECL shall recover <strong>the</strong> cost in <strong>the</strong> event of any damage to<br />
its property.<br />
• Contractor has to follow <strong>the</strong> safety rules.<br />
• PENALTY:<br />
• Any RO Systems when sent to party service center <strong>the</strong>n <strong>the</strong> RO System should<br />
be returned back duly repaired within 7 days period or o<strong>the</strong>rwise party has to<br />
provide it's own RO System in place of vacant location, failing which a penalty of<br />
Rs.50/- per day will be imposed. Unreasonable delays for replacement of spares<br />
will lead to <strong>the</strong> termination of contract and forfeiting S/D etc of <strong>the</strong> contractor.<br />
• Payment shall be made as per actual nos. of RO Systems serviced every two<br />
months only. If RO System is not serviced for what so ever reason even after it<br />
was asked , <strong>the</strong>n 100% of applicable amount of service as penalty will be<br />
recovered.<br />
• At <strong>the</strong> time of completion of contract, all <strong>the</strong> RO Systems under contract shall be in<br />
working condition with optimum output, o<strong>the</strong>rwise cost of repairing if any required<br />
will be recovered from <strong>the</strong> contractor’s bill.<br />
• After service/repairs/replacement of spares; if <strong>the</strong> RO System is not giving optimum<br />
output / poor water quality and same is not rectified within 15 days, no payment for<br />
service / repair s etc. Shall be made in that case. Also penalty will be imposed as<br />
per clause no.17 of general terms and condition.<br />
• The Main terms & conditions of this contractor are narrated in details under<br />
Schedule – A here to and <strong>the</strong> contractor is supposed to observe <strong>the</strong> same strictly<br />
without exception. In <strong>the</strong> event of deviation from any of <strong>the</strong> conditions under<br />
schedule-A hereto, <strong>the</strong> contractor shall be held fully reasonable for <strong>the</strong> same and<br />
<strong>the</strong>y shall be bound to discharge full consequential liabilities <strong>the</strong>reof.<br />
Signature of Contractor<br />
I/c Addl.Chief Engineer<br />
GSECL, GBPS, UTRAN.