04.01.2014 Views

Delivering Low Cost Platinum Production

Delivering Low Cost Platinum Production

Delivering Low Cost Platinum Production

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Kalahari <strong>Platinum</strong> Project<br />

Project Study Options<br />

• Throughput 1.2 MTPA to 3 MTPA<br />

• Capital <strong>Cost</strong> US$100 to US$250 Million<br />

• Operating <strong>Cost</strong> ~US$200-300/oz 3E PGM<br />

• <strong>Production</strong> 120,000 - 300,000 oz pa<br />

• Head Grade from 2.5 to 3.5 g/t<br />

• Eskom power with stand alone power as option<br />

• Multiple Open Pits<br />

• Flotation Concentrate to smelter<br />

• Rapid Start of <strong>Production</strong> – mid 2011<br />

• Target High Grade ~3 – 5 Moz to 200m<br />

PLA/PLAA www.platinumaus.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!