Delivering Low Cost Platinum Production
Delivering Low Cost Platinum Production
Delivering Low Cost Platinum Production
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Kalahari <strong>Platinum</strong> Project<br />
Project Study Options<br />
• Throughput 1.2 MTPA to 3 MTPA<br />
• Capital <strong>Cost</strong> US$100 to US$250 Million<br />
• Operating <strong>Cost</strong> ~US$200-300/oz 3E PGM<br />
• <strong>Production</strong> 120,000 - 300,000 oz pa<br />
• Head Grade from 2.5 to 3.5 g/t<br />
• Eskom power with stand alone power as option<br />
• Multiple Open Pits<br />
• Flotation Concentrate to smelter<br />
• Rapid Start of <strong>Production</strong> – mid 2011<br />
• Target High Grade ~3 – 5 Moz to 200m<br />
PLA/PLAA www.platinumaus.com