Smokey Hills <strong>Platinum</strong> Mine<br />

• Sept 2008 – Underground Mine<br />

• Jan 2009 – First <strong>Production</strong><br />

• April/May 2009 - Full <strong>Production</strong><br />

• Standby Generating Power of 8<br />

MVA installed<br />

• Offtake IRS - Life of Mine<br />

• Capital <strong>Cost</strong> US$45 Million<br />

• Hedging – 15% for 5 years<br />

at ~US$2,000/oz Pt &<br />

~US$500/oz Pd, R7.5:1US$<br />

• Designed for Expansion<br />

PLA/PLAA www.platinumaus.com