04.01.2014 Views

Delivering Low Cost Platinum Production

Delivering Low Cost Platinum Production

Delivering Low Cost Platinum Production

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Delivering</strong> on the Strategy<br />

• Smokey Hills<br />

– 1 Moz Resource<br />

– Open Pit & Shallow Underground<br />

– <strong>Production</strong> - 95,000 oz 4E PGM pa<br />

– <strong>Production</strong> Build Up<br />

• Kalahari <strong>Platinum</strong><br />

– 4.2 Moz 4E PGM Resource<br />

– Open Pit – 120-300,000 oz PGM pa<br />

– Feasibility Study – first half 2009<br />

– Significant Regional Presence<br />

PLA/PLAA www.platinumaus.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!