04.01.2014 Views

Delivering Low Cost Platinum Production

Delivering Low Cost Platinum Production

Delivering Low Cost Platinum Production

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Kalplats - Stellex North Project<br />

Stellex <strong>Platinum</strong><br />

• PLA 49% - Batsalani<br />

51% with PLA earning<br />

up to 70%<br />

• 26 km of strike length<br />

• Prospecting Right Issued<br />

• Aeromag & Soil Surveys<br />

in 2008/9<br />

.<br />

PLA/PLAA www.platinumaus.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!