Delivering Low Cost Platinum Production
Delivering Low Cost Platinum Production
Delivering Low Cost Platinum Production
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Delivering</strong> <strong>Low</strong> <strong>Cost</strong> <strong>Platinum</strong><br />
<strong>Production</strong><br />
March 2009<br />
PLA/PLAA www.platinumaus.com
<strong>Platinum</strong> Australia<br />
• World’s s Newest <strong>Platinum</strong> Producer<br />
• Listed on ASX and AIM<br />
– Market Cap – US$100 Million<br />
– ASX 200 & AIM 100<br />
• Largest Shareholders<br />
– JP Morgan – 8.7%<br />
– Colonial First – 8.6%<br />
– NAB – 6.6%<br />
– Perpetual – 5%<br />
– AMP – 3%<br />
– Macquarie – 3%<br />
PLA/PLAA www.platinumaus.com
<strong>Platinum</strong> Australia Strategy<br />
• Open Pit & Shallow Underground<br />
• Rapid Evaluation & Development<br />
• <strong>Low</strong> Operating <strong>Cost</strong>s – grade, depth, overheads<br />
• <strong>Low</strong> Capital <strong>Cost</strong> – “Fit for Purpose”<br />
• No constraints on size of project<br />
• Joint Ventures & other arrangements<br />
• Build on existing <strong>Production</strong> and Projects<br />
PLA/PLAA www.platinumaus.com
<strong>Delivering</strong> on the Strategy<br />
• Smokey Hills<br />
– 1 Moz Resource<br />
– Open Pit & Shallow Underground<br />
– <strong>Production</strong> - 95,000 oz 4E PGM pa<br />
– <strong>Production</strong> Build Up<br />
• Kalahari <strong>Platinum</strong><br />
– 4.2 Moz 4E PGM Resource<br />
– Open Pit – 120-300,000 oz PGM pa<br />
– Feasibility Study – first half 2009<br />
– Significant Regional Presence<br />
PLA/PLAA www.platinumaus.com
<strong>Platinum</strong> Australia Limited<br />
Project Locations<br />
PLA/PLAA www.platinumaus.com
Smokey Hills <strong>Platinum</strong> Mine<br />
PLA/PLAA www.platinumaus.com
Smokey Hills <strong>Platinum</strong> Mine<br />
• Nov 2007 – Mining Right<br />
• Nov 2007 – Start Site Works<br />
• Jan 2008 – Start Open Pit<br />
• Sept 2008 – Commissioning<br />
• May 2005 - JV Signed<br />
• July 2005 – Drilling Program<br />
• July 2006 – BFS Completed<br />
• Dec 2006 – Mills Ordered<br />
• July 2007 - EPCM Contract<br />
awarded to GRD Minproc<br />
PLA/PLAA www.platinumaus.com
Smokey Hills <strong>Platinum</strong> Mine<br />
• Sept 2008 – Underground Mine<br />
• Jan 2009 – First <strong>Production</strong><br />
• April/May 2009 - Full <strong>Production</strong><br />
• Standby Generating Power of 8<br />
MVA installed<br />
• Offtake IRS - Life of Mine<br />
• Capital <strong>Cost</strong> US$45 Million<br />
• Hedging – 15% for 5 years<br />
at ~US$2,000/oz Pt &<br />
~US$500/oz Pd, R7.5:1US$<br />
• Designed for Expansion<br />
PLA/PLAA www.platinumaus.com
Smokey Hills <strong>Platinum</strong> Mine<br />
BFS July 06<br />
Current<br />
Base Case 1<br />
January 2009 2<br />
Initial Capital<br />
US$ Million<br />
40<br />
45 4<br />
Ongoing Capex<br />
US$ Million<br />
14<br />
11<br />
<strong>Production</strong><br />
Ozs 4E p.a.<br />
95,000<br />
95,000<br />
Cash <strong>Cost</strong>s 3<br />
US$/oz 4E<br />
225<br />
190<br />
Basket Price<br />
US$/oz 4E<br />
677<br />
680<br />
IRR (pre Tax)<br />
70%<br />
~60%<br />
Cashflow (Pre Tax)<br />
US$ Million<br />
140<br />
190<br />
Cashflow (EBITDA)<br />
US$ Million<br />
30 pa<br />
35 pa<br />
1 - Pt US$900/oz; Pd US$300/oz; Gold US$450/oz; Rh US$1,500/oz; ZAR 7:1 US$<br />
2 - Pt US$1,000/oz; Pd US$200/oz; Gold US$800/oz; Rh US$1,500/oz; ZAR10:1 US$; Excludes Hedging<br />
3 – Net of Credits for Ni, Cu, Ru, Ir & Chrome<br />
4 – Including Diesel Generators US$3 Million<br />
PLA/PLAA www.platinumaus.com
Smokey Hills <strong>Platinum</strong> Mine<br />
Mining Contracts<br />
Opencast Mining<br />
• Contractor - CCT<br />
• 40 000 t per month<br />
• 16 Months<br />
• Waste utilized for tailings dam<br />
construction<br />
Underground Mining<br />
• Contractor – Redpath Mining<br />
• 60 000t per month<br />
• 5 year contract<br />
• LOM 7 years<br />
PLA/PLAA www.platinumaus.com
Smokey Hills <strong>Platinum</strong> Mine<br />
Processing Plant<br />
F TH<br />
CR Tails<br />
F<br />
TH<br />
T CY<br />
FFC Conc<br />
CR Tails<br />
Cleaner Tails CY<br />
u/f<br />
Process Fines Th<br />
FFC Conc<br />
PLA/PLAA www.platinumaus.com<br />
Larox Filter<br />
Final Concentrate<br />
Final<br />
Tails
Smokey Hills <strong>Platinum</strong> Mine<br />
Summary<br />
• Development – 3 ½ Years from JV to <strong>Production</strong><br />
• <strong>Production</strong> 95,000 ozs 4E PGM for seven years<br />
• Initial Capital <strong>Cost</strong> US$45 Million at ZAR10:US$1<br />
• Debt Finance by Standard Bank ~ZAR260 Million plus ongoing<br />
Mining Capital Equipment ~ZAR72 Million<br />
• Operating <strong>Cost</strong> US$300/oz 4E PGM net of credits, including<br />
Smelting & Refining Charges<br />
• PLA 69.75%, effective ~85% of Economic Interest<br />
• Potential for expansion or extensions<br />
• Complete Standby Power installed<br />
• <strong>Production</strong> of ~75,000 oz 4E PGM expected 2009 CY<br />
PLA/PLAA www.platinumaus.com
Kalahari <strong>Platinum</strong> Project<br />
PLA/PLAA www.platinumaus.com
Kalahari <strong>Platinum</strong> Project<br />
BOTSWANA<br />
20km<br />
Kalgold O/C<br />
Mine<br />
Kalplats<br />
PGM Project<br />
• JV with ARMplatinum –<br />
PLA earning 49%<br />
• 330 km West of<br />
Johannesburg<br />
• Stella Layered Intrusive<br />
(“SLI”) within the Kraaipan<br />
Greenstone Belt<br />
• 45 km from Kalgold Mine<br />
• Good Infrastructure<br />
PLA/PLAA www.platinumaus.com
Kalahari <strong>Platinum</strong> Project<br />
Crater<br />
Scorpio<br />
Vela<br />
Mira<br />
Sirius<br />
Tucana<br />
Orion<br />
1km<br />
Serpens North<br />
Serpens South<br />
Crux<br />
Pointer<br />
• 140,000m drilled<br />
• 7 Deposits with resources<br />
• Several Other Prospects<br />
• All open at depth &<br />
along strike<br />
• 4.2 Million oz PGM JORC<br />
compliant Resource<br />
• Potential for major<br />
expansion of resource<br />
PLA/PLAA www.platinumaus.com
Kalahari <strong>Platinum</strong> Project<br />
Total<br />
Pt+Pd+Au<br />
Thickness<br />
LG<br />
1.0 g/t 10m<br />
Mid<br />
Reef<br />
Package<br />
MR<br />
1.1 g/t 8m<br />
2.5 g/t 2m<br />
Main<br />
Reef<br />
Package<br />
LM<br />
UM<br />
3.8 g/t 2 - 3m<br />
1.0 g/t 10m<br />
4.5 g/t 3 - 6m<br />
PLA/PLAA www.platinumaus.com
Kalahari <strong>Platinum</strong> Project<br />
Initial Resource Update<br />
Mineral Resource<br />
Total<br />
Main Reef<br />
High Grade<br />
‘000 oz<br />
‘000 oz<br />
‘000 oz<br />
Crux<br />
Harmony<br />
583<br />
320<br />
186<br />
Snowden 1<br />
1,238<br />
702<br />
404<br />
Difference<br />
+655<br />
+382<br />
+218<br />
Crater & Orion<br />
Harmony<br />
1,175<br />
797<br />
630<br />
Snowden 1<br />
1,282<br />
810<br />
584<br />
Difference<br />
+107<br />
+13<br />
-46<br />
Crux, Crater & Orion<br />
Difference<br />
+762<br />
+395<br />
+172<br />
1 - Snowden Resource is interim to be updated with additional drilling results prior to completion of Feasibility Study<br />
PLA/PLAA www.platinumaus.com
Kalahari <strong>Platinum</strong> Project<br />
Project Study Options<br />
• Throughput 1.2 MTPA to 3 MTPA<br />
• Capital <strong>Cost</strong> US$100 to US$250 Million<br />
• Operating <strong>Cost</strong> ~US$200-300/oz 3E PGM<br />
• <strong>Production</strong> 120,000 - 300,000 oz pa<br />
• Head Grade from 2.5 to 3.5 g/t<br />
• Eskom power with stand alone power as option<br />
• Multiple Open Pits<br />
• Flotation Concentrate to smelter<br />
• Rapid Start of <strong>Production</strong> – mid 2011<br />
• Target High Grade ~3 – 5 Moz to 200m<br />
PLA/PLAA www.platinumaus.com
Kalahari <strong>Platinum</strong> Project<br />
Prospects to be developed Post DFS<br />
• Scorpio<br />
• Mira<br />
– 1,000m strike length with multiple intersects over 300m strike incl. i<br />
15m @ 2.32 g/t, , 4m @ 4.15 g/t & 4m @ 3.09 g/t<br />
– Multiple intersects over 400m incl. 33m @ 2.58 g/t, , 13m @ 5.11 g/t,<br />
8m @ 4.66 g/t & 7m @ 4.14 g/t<br />
• Sirius South<br />
– Multiple intersects incl. 6m @ 3.22 g/t & 8m @ 3.42 g/t<br />
• Pointer<br />
– 800m soil & mag anomaly with multiple intersects incl. 3m @ 3.92 g/t<br />
• Vela North<br />
– ~800m soil anomaly<br />
PLA/PLAA www.platinumaus.com
Kalplats Extension Project<br />
PLA - ARM JV<br />
• 50:50 Contributing<br />
• Addition 38 km strike<br />
• Extensions to PGM mineralised<br />
zones<br />
• Supported by Aeromag<br />
Interpretation<br />
• Detailed Aeromag Survey<br />
completed<br />
• Soil geochemical survey under<br />
way<br />
• First drilling under way<br />
PLA/PLAA www.platinumaus.com
Kalplats Extension Project<br />
First Drilling Results<br />
KE001 5m @ 3.23 g/t 3E<br />
incl 3m @ 4.65 g/t 3E<br />
KE008 3m @ 3.38 g/t 3E<br />
incl 1m @ 6.81 g/t 3E<br />
KE009 6m @ 3.19 g/t 3E<br />
incl 4m @ 4.28 g/t 3E<br />
. PLA/PLAA www.platinumaus.com
Kalplats - Stellex North Project<br />
Stellex <strong>Platinum</strong><br />
• PLA 49% - Batsalani<br />
51% with PLA earning<br />
up to 70%<br />
• 26 km of strike length<br />
• Prospecting Right Issued<br />
• Aeromag & Soil Surveys<br />
in 2008/9<br />
.<br />
PLA/PLAA www.platinumaus.com
<strong>Platinum</strong> Australia Limited<br />
Smokey Hills<br />
Kalplats<br />
180000<br />
P<br />
G<br />
M<br />
o<br />
z<br />
s<br />
/<br />
a<br />
n<br />
n<br />
u<br />
m<br />
160000<br />
140000<br />
120000<br />
100000<br />
80000<br />
60000<br />
40000<br />
20000<br />
0<br />
2009 2010 2011 2012<br />
Year<br />
PLA/PLAA www.platinumaus.com
<strong>Platinum</strong> Australia Limited<br />
• The World’s s newest <strong>Platinum</strong> Producer<br />
• One of the lowest cost producers in the industry with costs of<br />
~US$300/oz 4E vs Industry average of US$650/oz 4E<br />
• Cashflow of ~US$25 Million (EBITDA) in 2009 at current prices<br />
• <strong>Production</strong> of 75,000 ozs 4E in 2009 with projected growth to up<br />
to 200,000 ozs 4E by 2012<br />
• Focus on Open Pit and Shallow Underground Operations with<br />
<strong>Low</strong> Capital & Operating <strong>Cost</strong>s<br />
• With a proven record of rapid development from acquisition to<br />
production, well placed to benefit from current market conditions<br />
PLA/PLAA www.platinumaus.com
<strong>Platinum</strong> Australia Limited<br />
“This presentation and information contained in it is being provided to shareholders and investors for information<br />
purposes only. Shareholders and investors should undertake their own evaluation of this information and otherwise<br />
contact their professional advisers in the event they wish to buy or sell shares. To the extent the information contains<br />
any projections the Company has provided these projections based upon the information that has been provided<br />
to the Company. The Company does not make any representations as to the accuracy or otherwise of that third<br />
party information."<br />
Qualification Statement<br />
We confirm that exploration results contained in this report are based on information compiled by PLA Exploration<br />
Staff and reviewed by Peter Allchurch, who is a Fellow of the Australian Institute of Mining and Metallurgy. Peter<br />
Allchurch is non-executive Chairman of <strong>Platinum</strong> Australia Limited. Peter Allchurch has more than 5 years experience<br />
which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he<br />
is undertaking, to qualify as a competent person as defined in the 2004 edition of the ‘Australasian Code for<br />
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Peter Allchurch consents to the inclusion in<br />
the report of the matters based on his information in the form and context in which it appears.<br />
The information in this report that relates to the Crater, Orion and Crux Mineral Resources is based on a resources<br />
estimates compiled by Mr. David Gray who is a full-time employee of Snowden Mining Industry Consultants and is a<br />
Member of the South African Council for Natural Scientific Professions (member no 400018/04) .<br />
Mr. Gray has more than 15 years experience which is relevant to the style of mineralisation and type of deposit<br />
under consideration and to the activity which he is undertaking and qualifies as a Competent Person as defined in<br />
the 2004 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.<br />
Mr Gray consents to the inclusion in the report of the matters based on his information in the form and context in<br />
which it appears.<br />
PLA/PLAA www.platinumaus.com