<strong>Delivering</strong> <strong>Low</strong> <strong>Cost</strong> <strong>Platinum</strong><br />

<strong>Production</strong><br />

March 2009<br />

PLA/PLAA www.platinumaus.com


<strong>Platinum</strong> Australia<br />

• World’s s Newest <strong>Platinum</strong> Producer<br />

• Listed on ASX and AIM<br />

– Market Cap – US$100 Million<br />

– ASX 200 & AIM 100<br />

• Largest Shareholders<br />

– JP Morgan – 8.7%<br />

– Colonial First – 8.6%<br />

– NAB – 6.6%<br />

– Perpetual – 5%<br />

– AMP – 3%<br />

– Macquarie – 3%<br />

PLA/PLAA www.platinumaus.com


<strong>Platinum</strong> Australia Strategy<br />

• Open Pit & Shallow Underground<br />

• Rapid Evaluation & Development<br />

• <strong>Low</strong> Operating <strong>Cost</strong>s – grade, depth, overheads<br />

• <strong>Low</strong> Capital <strong>Cost</strong> – “Fit for Purpose”<br />

• No constraints on size of project<br />

• Joint Ventures & other arrangements<br />

• Build on existing <strong>Production</strong> and Projects<br />

PLA/PLAA www.platinumaus.com


<strong>Delivering</strong> on the Strategy<br />

• Smokey Hills<br />

– 1 Moz Resource<br />

– Open Pit & Shallow Underground<br />

– <strong>Production</strong> - 95,000 oz 4E PGM pa<br />

– <strong>Production</strong> Build Up<br />

• Kalahari <strong>Platinum</strong><br />

– 4.2 Moz 4E PGM Resource<br />

– Open Pit – 120-300,000 oz PGM pa<br />

– Feasibility Study – first half 2009<br />

– Significant Regional Presence<br />

PLA/PLAA www.platinumaus.com


<strong>Platinum</strong> Australia Limited<br />

Project Locations<br />

PLA/PLAA www.platinumaus.com


Smokey Hills <strong>Platinum</strong> Mine<br />

PLA/PLAA www.platinumaus.com


Smokey Hills <strong>Platinum</strong> Mine<br />

• Nov 2007 – Mining Right<br />

• Nov 2007 – Start Site Works<br />

• Jan 2008 – Start Open Pit<br />

• Sept 2008 – Commissioning<br />

• May 2005 - JV Signed<br />

• July 2005 – Drilling Program<br />

• July 2006 – BFS Completed<br />

• Dec 2006 – Mills Ordered<br />

• July 2007 - EPCM Contract<br />

awarded to GRD Minproc<br />

PLA/PLAA www.platinumaus.com


Smokey Hills <strong>Platinum</strong> Mine<br />

• Sept 2008 – Underground Mine<br />

• Jan 2009 – First <strong>Production</strong><br />

• April/May 2009 - Full <strong>Production</strong><br />

• Standby Generating Power of 8<br />

MVA installed<br />

• Offtake IRS - Life of Mine<br />

• Capital <strong>Cost</strong> US$45 Million<br />

• Hedging – 15% for 5 years<br />

at ~US$2,000/oz Pt &<br />

~US$500/oz Pd, R7.5:1US$<br />

• Designed for Expansion<br />

PLA/PLAA www.platinumaus.com


Smokey Hills <strong>Platinum</strong> Mine<br />

BFS July 06<br />

Current<br />

Base Case 1<br />

January 2009 2<br />

Initial Capital<br />

US$ Million<br />

40<br />

45 4<br />

Ongoing Capex<br />

US$ Million<br />

14<br />

11<br />

<strong>Production</strong><br />

Ozs 4E p.a.<br />

95,000<br />

95,000<br />

Cash <strong>Cost</strong>s 3<br />

US$/oz 4E<br />

225<br />

190<br />

Basket Price<br />

US$/oz 4E<br />

677<br />

680<br />

IRR (pre Tax)<br />

70%<br />

~60%<br />

Cashflow (Pre Tax)<br />

US$ Million<br />

140<br />

190<br />

Cashflow (EBITDA)<br />

US$ Million<br />

30 pa<br />

35 pa<br />

1 - Pt US$900/oz; Pd US$300/oz; Gold US$450/oz; Rh US$1,500/oz; ZAR 7:1 US$<br />

2 - Pt US$1,000/oz; Pd US$200/oz; Gold US$800/oz; Rh US$1,500/oz; ZAR10:1 US$; Excludes Hedging<br />

3 – Net of Credits for Ni, Cu, Ru, Ir & Chrome<br />

4 – Including Diesel Generators US$3 Million<br />

PLA/PLAA www.platinumaus.com


Smokey Hills <strong>Platinum</strong> Mine<br />

Mining Contracts<br />

Opencast Mining<br />

• Contractor - CCT<br />

• 40 000 t per month<br />

• 16 Months<br />

• Waste utilized for tailings dam<br />

construction<br />

Underground Mining<br />

• Contractor – Redpath Mining<br />

• 60 000t per month<br />

• 5 year contract<br />

• LOM 7 years<br />

PLA/PLAA www.platinumaus.com


Smokey Hills <strong>Platinum</strong> Mine<br />

Processing Plant<br />

F TH<br />

CR Tails<br />

F<br />

TH<br />

T CY<br />

FFC Conc<br />

CR Tails<br />

Cleaner Tails CY<br />

u/f<br />

Process Fines Th<br />

FFC Conc<br />

PLA/PLAA www.platinumaus.com<br />

Larox Filter<br />

Final Concentrate<br />

Final<br />

Tails


Smokey Hills <strong>Platinum</strong> Mine<br />

Summary<br />

• Development – 3 ½ Years from JV to <strong>Production</strong><br />

• <strong>Production</strong> 95,000 ozs 4E PGM for seven years<br />

• Initial Capital <strong>Cost</strong> US$45 Million at ZAR10:US$1<br />

• Debt Finance by Standard Bank ~ZAR260 Million plus ongoing<br />

Mining Capital Equipment ~ZAR72 Million<br />

• Operating <strong>Cost</strong> US$300/oz 4E PGM net of credits, including<br />

Smelting & Refining Charges<br />

• PLA 69.75%, effective ~85% of Economic Interest<br />

• Potential for expansion or extensions<br />

• Complete Standby Power installed<br />

• <strong>Production</strong> of ~75,000 oz 4E PGM expected 2009 CY<br />

PLA/PLAA www.platinumaus.com


Kalahari <strong>Platinum</strong> Project<br />

PLA/PLAA www.platinumaus.com


Kalahari <strong>Platinum</strong> Project<br />

BOTSWANA<br />

20km<br />

Kalgold O/C<br />

Mine<br />

Kalplats<br />

PGM Project<br />

• JV with ARMplatinum –<br />

PLA earning 49%<br />

• 330 km West of<br />

Johannesburg<br />

• Stella Layered Intrusive<br />

(“SLI”) within the Kraaipan<br />

Greenstone Belt<br />

• 45 km from Kalgold Mine<br />

• Good Infrastructure<br />

PLA/PLAA www.platinumaus.com


Kalahari <strong>Platinum</strong> Project<br />

Crater<br />

Scorpio<br />

Vela<br />

Mira<br />

Sirius<br />

Tucana<br />

Orion<br />

1km<br />

Serpens North<br />

Serpens South<br />

Crux<br />

Pointer<br />

• 140,000m drilled<br />

• 7 Deposits with resources<br />

• Several Other Prospects<br />

• All open at depth &<br />

along strike<br />

• 4.2 Million oz PGM JORC<br />

compliant Resource<br />

• Potential for major<br />

expansion of resource<br />

PLA/PLAA www.platinumaus.com


Kalahari <strong>Platinum</strong> Project<br />

Total<br />

Pt+Pd+Au<br />

Thickness<br />

LG<br />

1.0 g/t 10m<br />

Mid<br />

Reef<br />

Package<br />

MR<br />

1.1 g/t 8m<br />

2.5 g/t 2m<br />

Main<br />

Reef<br />

Package<br />

LM<br />

UM<br />

3.8 g/t 2 - 3m<br />

1.0 g/t 10m<br />

4.5 g/t 3 - 6m<br />

PLA/PLAA www.platinumaus.com


Kalahari <strong>Platinum</strong> Project<br />

Initial Resource Update<br />

Mineral Resource<br />

Total<br />

Main Reef<br />

High Grade<br />

‘000 oz<br />

‘000 oz<br />

‘000 oz<br />

Crux<br />

Harmony<br />

583<br />

320<br />

186<br />

Snowden 1<br />

1,238<br />

702<br />

404<br />

Difference<br />

+655<br />

+382<br />

+218<br />

Crater & Orion<br />

Harmony<br />

1,175<br />

797<br />

630<br />

Snowden 1<br />

1,282<br />

810<br />

584<br />

Difference<br />

+107<br />

+13<br />

-46<br />

Crux, Crater & Orion<br />

Difference<br />

+762<br />

+395<br />

+172<br />

1 - Snowden Resource is interim to be updated with additional drilling results prior to completion of Feasibility Study<br />

PLA/PLAA www.platinumaus.com


Kalahari <strong>Platinum</strong> Project<br />

Project Study Options<br />

• Throughput 1.2 MTPA to 3 MTPA<br />

• Capital <strong>Cost</strong> US$100 to US$250 Million<br />

• Operating <strong>Cost</strong> ~US$200-300/oz 3E PGM<br />

• <strong>Production</strong> 120,000 - 300,000 oz pa<br />

• Head Grade from 2.5 to 3.5 g/t<br />

• Eskom power with stand alone power as option<br />

• Multiple Open Pits<br />

• Flotation Concentrate to smelter<br />

• Rapid Start of <strong>Production</strong> – mid 2011<br />

• Target High Grade ~3 – 5 Moz to 200m<br />

PLA/PLAA www.platinumaus.com


Kalahari <strong>Platinum</strong> Project<br />

Prospects to be developed Post DFS<br />

• Scorpio<br />

• Mira<br />

– 1,000m strike length with multiple intersects over 300m strike incl. i<br />

15m @ 2.32 g/t, , 4m @ 4.15 g/t & 4m @ 3.09 g/t<br />

– Multiple intersects over 400m incl. 33m @ 2.58 g/t, , 13m @ 5.11 g/t,<br />

8m @ 4.66 g/t & 7m @ 4.14 g/t<br />

• Sirius South<br />

– Multiple intersects incl. 6m @ 3.22 g/t & 8m @ 3.42 g/t<br />

• Pointer<br />

– 800m soil & mag anomaly with multiple intersects incl. 3m @ 3.92 g/t<br />

• Vela North<br />

– ~800m soil anomaly<br />

PLA/PLAA www.platinumaus.com


Kalplats Extension Project<br />

PLA - ARM JV<br />

• 50:50 Contributing<br />

• Addition 38 km strike<br />

• Extensions to PGM mineralised<br />

zones<br />

• Supported by Aeromag<br />

Interpretation<br />

• Detailed Aeromag Survey<br />

completed<br />

• Soil geochemical survey under<br />

way<br />

• First drilling under way<br />

PLA/PLAA www.platinumaus.com


Kalplats Extension Project<br />

First Drilling Results<br />

KE001 5m @ 3.23 g/t 3E<br />

incl 3m @ 4.65 g/t 3E<br />

KE008 3m @ 3.38 g/t 3E<br />

incl 1m @ 6.81 g/t 3E<br />

KE009 6m @ 3.19 g/t 3E<br />

incl 4m @ 4.28 g/t 3E<br />

. PLA/PLAA www.platinumaus.com


Kalplats - Stellex North Project<br />

Stellex <strong>Platinum</strong><br />

• PLA 49% - Batsalani<br />

51% with PLA earning<br />

up to 70%<br />

• 26 km of strike length<br />

• Prospecting Right Issued<br />

• Aeromag & Soil Surveys<br />

in 2008/9<br />

.<br />

PLA/PLAA www.platinumaus.com


<strong>Platinum</strong> Australia Limited<br />

Smokey Hills<br />

Kalplats<br />

180000<br />

P<br />

G<br />

M<br />

o<br />

z<br />

s<br />

/<br />

a<br />

n<br />

n<br />

u<br />

m<br />

160000<br />

140000<br />

120000<br />

100000<br />

80000<br />

60000<br />

40000<br />

20000<br />

0<br />

2009 2010 2011 2012<br />

Year<br />

PLA/PLAA www.platinumaus.com


<strong>Platinum</strong> Australia Limited<br />

• The World’s s newest <strong>Platinum</strong> Producer<br />

• One of the lowest cost producers in the industry with costs of<br />

~US$300/oz 4E vs Industry average of US$650/oz 4E<br />

• Cashflow of ~US$25 Million (EBITDA) in 2009 at current prices<br />

• <strong>Production</strong> of 75,000 ozs 4E in 2009 with projected growth to up<br />

to 200,000 ozs 4E by 2012<br />

• Focus on Open Pit and Shallow Underground Operations with<br />

<strong>Low</strong> Capital & Operating <strong>Cost</strong>s<br />

• With a proven record of rapid development from acquisition to<br />

production, well placed to benefit from current market conditions<br />

PLA/PLAA www.platinumaus.com


<strong>Platinum</strong> Australia Limited<br />

“This presentation and information contained in it is being provided to shareholders and investors for information<br />

purposes only. Shareholders and investors should undertake their own evaluation of this information and otherwise<br />

contact their professional advisers in the event they wish to buy or sell shares. To the extent the information contains<br />

any projections the Company has provided these projections based upon the information that has been provided<br />

to the Company. The Company does not make any representations as to the accuracy or otherwise of that third<br />

party information."<br />

Qualification Statement<br />

We confirm that exploration results contained in this report are based on information compiled by PLA Exploration<br />

Staff and reviewed by Peter Allchurch, who is a Fellow of the Australian Institute of Mining and Metallurgy. Peter<br />

Allchurch is non-executive Chairman of <strong>Platinum</strong> Australia Limited. Peter Allchurch has more than 5 years experience<br />

which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he<br />

is undertaking, to qualify as a competent person as defined in the 2004 edition of the ‘Australasian Code for<br />

Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Peter Allchurch consents to the inclusion in<br />

the report of the matters based on his information in the form and context in which it appears.<br />

The information in this report that relates to the Crater, Orion and Crux Mineral Resources is based on a resources<br />

estimates compiled by Mr. David Gray who is a full-time employee of Snowden Mining Industry Consultants and is a<br />

Member of the South African Council for Natural Scientific Professions (member no 400018/04) .<br />

Mr. Gray has more than 15 years experience which is relevant to the style of mineralisation and type of deposit<br />

under consideration and to the activity which he is undertaking and qualifies as a Competent Person as defined in<br />

the 2004 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.<br />

Mr Gray consents to the inclusion in the report of the matters based on his information in the form and context in<br />

which it appears.<br />

PLA/PLAA www.platinumaus.com