Project Development<br />

Platinum Australia has recently<br />

commenced a 20,000 metre<br />

drilling program which is focused<br />

on more fully evaluating the open<br />

pit potential of the project currently<br />

standing at 12 million tonnes @<br />

3.6 g/t 3E PGM. A key element<br />

in the planning of this program<br />

has been the results from the low<br />

level airborne survey undertaken<br />

by PLA which provided more<br />

detailed information on the<br />

geology and structure of the<br />

project and identified a number<br />

of targets outside of the known<br />

deposits. An updated resource<br />

will be estimated following the<br />

completion of this program to be<br />

used as the basis of the PFS being<br />

undertaken with GRD Minproc as<br />

the Lead Engineer.<br />

A N N U A L R E P O R T 2 0 0 6<br />

Following the completion of the<br />

initial 20,000 metres, PLA will<br />

continue the drilling program with<br />

a further 25,000 metres which<br />

should be completed in the second<br />

half of 2007. This second phase<br />

drilling program will be aimed at<br />

raising the status of the identified<br />

deposits, testing the additional<br />

prospects and targets that have<br />

been identified and infilling<br />

between the know deposits. The<br />

results from this program will<br />

allow a further resource estimate<br />

to be undertaken which will form<br />

the basis for the BFS on the<br />

project.<br />

The study will focus on the development of an open cut<br />

mining operation producing a flotation concentrate for<br />

smelting and/or refining by others. It is anticipated that<br />

the study will also provide an indication of the longer<br />

term underground potential of the project.<br />

Part of extended area<br />

under application<br />

Kalpats detailed Aeromag including part of extended area.<br />

24 RIVERS PGM PROJECT<br />

The results from the initial work on this project did not<br />

identify any potentially economic mineralisation and the<br />

Company withdrew from the project in August <strong>2006</strong>.<br />