Management and Monitoring <strong>for</strong> <strong>HCV</strong> 4.1<br />

Management Recommendations<br />

Identify and mark catchment boundaries<br />

on maps and include in FMPs,<br />

establishing a ‘no logging’ buffer zone<br />

outside the catchment area.<br />

Timber harvesting activities within<br />

the water catchment and buffer areas<br />

should be prohibited unless permitted<br />

by law.<br />

Guidance<br />

FMPs, topographic maps, gazette notifications. Also<br />

refer to NFC decisions.<br />

PM: Forestry Department guidelines (e.g. Forestry<br />

Manual 1995), National Physical Plan.<br />

Sabah: Sabah Water <strong>Resource</strong>s Enactment 1998, RIL<br />

guidelines (Forestry Department).<br />

Sarawak: Sarawak Water Ordinance 1994, guidelines<br />

from local authorities, including Forest Department &<br />

Department of Health.<br />

<strong>HCV</strong> 4.2 Erosion Control<br />

<strong>HCV</strong> 4.2 includes <strong>for</strong>est areas that have been legally gazetted <strong>for</strong> soil protection or conservation under<br />

federal and state laws e.g. the National Forestry Act 1984 (Peninsular <strong>Malaysia</strong>), <strong>for</strong>est areas which lie<br />

on slopes over 25 degrees (Sabah), areas classified as Terrain 4 in First Schedule: Forest Management<br />

Plan, Forest Timber License (Sarawak), and riparian areas covered under the DID guidelines.<br />

Identification of <strong>HCV</strong> 4.2<br />

Task<br />

Determine if <strong>for</strong>est contains riparian<br />

area covered under DID guidelines.<br />

PM: Determine if steep <strong>for</strong>est area<br />

has been officially classified as soil<br />

protection <strong>for</strong>est.<br />

Sabah: Determine if <strong>for</strong>est area is on a<br />

slope over 25 degrees and covers more<br />

than 2 ha.<br />

Sarawak: Determine if <strong>for</strong>est area is<br />

classified as Terrain 4.<br />

Data sources & requirements<br />

Government Gazette Notifications, RIL guidelines<br />

(Forest departments), DID guidelines, FMPs, finescale<br />

topography maps (if available), FRIM Soil Erosion<br />

Study.<br />

Sabah: Sabah Water <strong>Resource</strong>s Enactment 1998.<br />

Sarawak: Forest Engineering Plan, Management Plan<br />

Prescription (Forest Department), EIA report (NREB).<br />

Management and Monitoring <strong>for</strong> <strong>HCV</strong> 4.2<br />

Management Recommendations<br />

Avoid the construction of skid trails<br />

inside steep areas. Ground-based<br />

timber harvesting activities should<br />

be prohibited unless permitted by the<br />

relevant authority.<br />

Guidance<br />

RIL guidelines, FMPs, FRIM Soil Erosion Study,<br />

Appendix 11.<br />

PM: Forestry Manual (FDPM).<br />

Sabah: RIL guidelines (Forestry Department).<br />

Sarawak: Forest Engineering Plan, Management Plan<br />

Prescription (Forest Department), EIA report (NREB).<br />

-13-