State Route 22 Design-Build Project - ictpa-scc
State Route 22 Design-Build Project - ictpa-scc
State Route 22 Design-Build Project - ictpa-scc
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Background<br />
SR-<strong>22</strong> was built in 1960’s<br />
No major improvements since inception on<br />
this significant E/W corridor in OC<br />
Caltrans completed PA&ED in 2003<br />
The project cost is $550 million and was<br />
funded through Measure M and other<br />
federal, state and local funds<br />
OCTA took over the project and used D/B<br />
to start the contract in 9/2004