<strong>Design</strong>/<strong>Build</strong> Contract<br />

Awarded by OCTA in 8/2004 to GMR<br />

(Granite/Myers/Rados<br />

Rados)<br />

Bid price is $390.4 million<br />

The other bid was $185 million higher with<br />

a construction schedule 25% longer<br />

Opened the mainline traffic in 4/2007<br />

The substantial completion date was<br />

11/2007 and the final completion date was<br />

4/2008