Overall Work Program - Pima Association of Governments
Overall Work Program - Pima Association of Governments
Overall Work Program - Pima Association of Governments
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Transportation Planning<br />
43 – Transportation Systems Planning and Management<br />
Purpose:<br />
Maximize the benefits <strong>of</strong> operational strategies and activities on a regional basis for transportation systems<br />
through coordination and collaboration.<br />
Tasks:<br />
Regional ITS Activities<br />
• Review and update Regional ITS Architecture as needed.<br />
• Consolidate regional travel information for data storage and distribution.<br />
Regional Transportation Operations and Management Activities<br />
• Coordinate and update recommendations <strong>of</strong> the Regional Concept for Transportation Operations<br />
(RCTO) with stakeholders.<br />
• Coordinate Regional Signal Timing and Operations <strong>Program</strong> (RSTOP) to allow signal performance<br />
evaluation, refinements and necessary equipment upgrades.<br />
• Coordinate ongoing training <strong>of</strong> local personnel and <strong>of</strong>fer technical assistance.<br />
• Coordinate regional traffic operations center configuration.<br />
Regional Transportation System Preservation, including Pavement Management activities<br />
• Coordinate collection, processing and technical assistance for regional pavement management data.<br />
• Coordinate the upgrade <strong>of</strong> pavement data collection and storage equipment.<br />
• Coordinate strategies for the preservation <strong>of</strong> future regional corridors.<br />
• Coordinate strategies for jurisdictional transportation asset management.<br />
Regional Congestion Management Process<br />
• Implement performance monitoring program for congestion-related system performance.<br />
• Update the regional transportation system performance assessment five-year report and evaluate<br />
regional deficiencies using CMP guidelines and system Key Performance Measures.<br />
• Promote incorporation <strong>of</strong> appropriate congestion management strategies in TIP development.<br />
Deliverables:<br />
Regional Concept for Transportation Operations Progress Report and June 2013<br />
Action Plan Update<br />
Signal retiming throughout region and updated regional traffic signal Ongoing<br />
model with intersection geometry, current signal timing plans and current<br />
turning movement counts<br />
Regional signal operations guidebook; update as needed June 2013<br />
Congestion management system report including update <strong>of</strong> five-year June 2013<br />
regional transportation performance assessment<br />
Regional ITS Architecture Update June 2013<br />
Assessment <strong>of</strong> RTDN benefits June 2013<br />
<strong>Pima</strong> <strong>Association</strong> <strong>of</strong> <strong>Governments</strong> 13 June 28, 2012