03.02.2014 Views

SERVICE BULLETIN No.1147 - ABC Companies

SERVICE BULLETIN No.1147 - ABC Companies

SERVICE BULLETIN No.1147 - ABC Companies

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7<br />

8<br />

4<br />

5<br />

6<br />

3<br />

1<br />

2<br />

Figure 5: T2100 heating valve installation – early specification with electrically operated valve<br />

for front unit. Valve removal squence.<br />

8) Cut the tie wrap securing the water valve-to-control box multiwire connector.<br />

Separate the connector terminals (8, Figure 5).<br />

9) Pry-loose the hose ends of which the clamps have been undone and withdraw the valve<br />

assembly from the water valve and pump compartment.<br />

10) Undo and remove the screws securing the valve control box to the valve and pump<br />

compartment wall (see Figure 6). Tie the control box out of the way. It will be removed later<br />

in the procedure (see Section 3: Sonna-to-Burkert water valve conversion – Electrics).<br />

F04935<br />

Figure 6: Location of water valve<br />

electronic control box<br />

SB1147rev1_USA_en_2004-11-10<br />

Page 7 of 20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!